X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224251810020

Well Details

Well ID: 0224251810020
Loading map...
Location: 02/10-18-022-25W4/0
Location Alias: 02/10-18-22-25 W4M
Location Alias 2: 02/10-18-022-25 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 25
Section: 18
County/Municipality: Wheatland County
Well Name: ANTERRA ENTICE 10-18-22-25
Operator Name: Anterra Energy Inc.
License Number: 0154640
License Date: 1992-11-20
License Status: Abandoned
Spud Date: 1992-11-25
Final Drill Date: 1992-12-02
Well Total Depth: 1835.00 m
Surface Hole Latitude: 50.871641
Surface Hole Longitude: -113.453590

For data sources see[1][2]

Well History

Date Event
1992-11-20 Obtained License
1992-11-26 Surface Casing Operation Performed
1992-12-02 Finished Drilling
1992-12-02 Well Mode changed to Drilled and Cased
1992-12-03 Well Log Performed
1992-12-04 Production Casing Operation Performed
1992-12-04 Rig Released
1992-12-15 Well Log Performed
1992-12-16 Perforation Treatment Performed - Jet Perforation
1992-12-19 Well Log Performed
1993-01-10 Well Began Production
1993-01-10 Well Fluid changed to Crude Oil
1993-01-10 Well Mode changed to Pumping
1995-01-11 Well Log Performed
1995-01-12 Well Log Performed
1995-07-26 Perforation Treatment Performed - Jet Perforation
1995-07-26 Well Log Performed
1998-12-09 Perforation Treatment Performed - Jet Perforation
1998-12-09 Well Log Performed
1998-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-21 Perforation Treatment Performed - Jet Perforation
2003-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-01 Well Fluid changed to Crude Oil
2013-03-01 Well Mode changed to Suspended
2013-04-14 Well Fluid changed to Crude Oil
2013-04-14 Well Mode changed to Pumping
2017-09-01 Well Fluid changed to Crude Oil
2017-09-01 Well Mode changed to Suspended
2018-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-08 Plug Back Performed
2018-12-08 Well Fluid changed to Crude Oil
2018-12-08 Well Log Performed
2018-12-08 Well Mode changed to Abandoned Zone
2019-05-24 Well Abandoned
2019-05-24 Well Fluid changed to Crude Oil
2019-05-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-16 Perforation 1808.00 1810.00 13
1995-07-26 Perforation 1807.00 1810.00 17
1998-12-09 Perforation 1807.00 1810.00 17
1998-12-12 Acid Treatment 1807.00 1810.00 0
1999-10-21 Perforation 1803.00 1807.00 14
2003-07-13 Acid Treatment 1805.00 1807.20 0
2003-07-13 Acid Treatment 1803.00 1805.00 0
2018-12-08 Packing Device Capped w/Cement 1782.90 1790.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7514 0.0 0.0 0.0
1994 8364 0.0 0.0 0.0
1995 8453 0.0 0.0 0.0
1996 8481 0.0 0.0 0.0
1997 7750 0.0 0.0 0.0
1998 7927 0.0 0.0 0.0
1999 7164 0.0 0.0 0.0
2000 7449 0.0 0.0 0.0
2001 8304 0.0 0.0 0.0
2002 7428 0.0 0.0 0.0
2003 7357 0.0 0.0 0.0
2004 5682 0.0 0.0 0.0
2005 2781 0.0 0.0 0.0
2006 7203 0.0 0.0 0.0
2008 7096 0.0 0.0 0.0
2009 888 0.0 0.0 0.0
2010 744 0.0 0.0 0.0
2011 4468 0.0 0.0 0.0
2012 525 0.0 0.0 0.0
2013 2822 0.0 0.0 0.0
2014 3720 0.0 0.0 0.0
2015 2184 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References