X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224250911002

Well Details

Well ID: 0224250911002
Loading map...
Location: 00/11-09-022-25W4/2
Location Alias: 00/11-09-22-25 W4M
Location Alias 2: 00/11-09-022-25 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 25
Section: 09
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 11-9-22-25
Operator Name: Ember Resources Inc.
License Number: 0060416
License Date: 1976-09-30
License Status: Abandoned
Spud Date: 1976-10-11
Final Drill Date: 1976-10-22
Well Total Depth: 1770.90 m
Surface Hole Latitude: 50.858889
Surface Hole Longitude: -113.414978

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-30 Obtained License
1976-10-15 Drill Stem Test Performed
1976-10-22 Finished Drilling
1976-10-23 Drill Stem Test Performed
1976-10-24 Drill Stem Test Performed
1976-10-25 Production Casing Operation Performed
1977-01-06 Perforation Treatment Performed - Jet Perforation
1977-01-07 Perforation Treatment Performed - Jet Perforation
1977-05-19 Well Mode changed to Drilled and Cased
1982-08-01 Well Began Production
1982-08-01 Well Fluid changed to Gas
1982-08-01 Well Mode changed to Flowing
1994-05-09 Well Log Performed
1994-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-12 Plug Back Performed
1994-05-12 Well Fluid changed to Gas
1994-05-12 Well Mode changed to Flowing
2004-06-13 Well Log Performed
2004-06-15 Perforation Treatment Performed - Jet Perforation
2004-06-26 Perforation Treatment Performed - Fractured
2004-07-13 Well Fluid changed to Gas
2004-07-13 Well Mode changed to Flowing
2005-11-01 Well Fluid changed to Gas
2005-11-01 Well Mode changed to Suspended
2006-02-08 Perforation Treatment Performed - Jet Perforation
2006-02-09 Perforation Treatment Performed - Remedial Casing
2006-02-11 Well Log Performed
2006-03-06 Well Log Performed
2006-03-08 Perforation Treatment Performed - Jet Perforation
2006-03-08 Well Log Performed
2006-03-09 Perforation Treatment Performed - Remedial Casing
2006-03-13 Perforation Treatment Performed - Jet Perforation
2006-03-13 Well Log Performed
2006-03-14 Perforation Treatment Performed - Remedial Casing
2006-03-15 Well Log Performed
2006-03-16 Perforation Treatment Performed - Jet Perforation
2006-03-16 Perforation Treatment Performed - Remedial Casing
2006-03-17 Well Log Performed
2006-05-03 Perforation Treatment Performed - Jet Perforation
2006-05-03 Well Log Performed
2006-05-04 Perforation Treatment Performed - Remedial Casing
2006-05-05 Well Log Performed
2007-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-17 Plug Back Performed
2007-11-17 Well Fluid changed to Gas
2007-11-17 Well Mode changed to Abandoned Zone
2014-06-09 Well Abandoned
2014-06-09 Well Fluid changed to Gas
2014-06-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-06 Perforation 1445.40 1446.90 13
2006-02-09 Remedial Casing Cementing 698.00 699.00 0
2006-03-08 Perforation 653.50 654.50 17
2006-03-09 Remedial Casing Cementing 653.50 654.50 0
2006-03-13 Perforation 580.00 581.00 17
2006-03-14 Remedial Casing Cementing 580.00 581.00 0
2006-03-16 Perforation 505.00 506.00 17
2006-03-16 Remedial Casing Cementing 505.00 506.00 0
2006-05-03 Perforation 409.00 410.00 17
2006-05-04 Remedial Casing Cementing 409.00 410.00 0
2007-11-17 Packing Device Capped w/Cement 1.20 102.00 0
1977-01-07 Perforation 848.00 848.90 7
1977-01-07 Perforation 852.20 853.40 7
1977-01-07 Perforation 854.40 855.00 7
1977-01-07 Perforation 855.90 858.30 7
1994-05-12 Packing Device Capped w/Cement 1419.90 1423.00 0
2004-06-15 Perforation 764.00 768.00 14
2004-06-26 Fracture 764.00 768.00 0
2006-02-08 Perforation 698.00 699.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2930 0.0 0.0 0.0
1983 7377 0.0 0.0 0.0
1984 6460 0.0 0.0 0.0
1985 7986 0.0 0.0 0.0
1986 8069 0.0 0.0 0.0
1987 7170 0.0 0.0 0.0
1988 7971 0.0 0.0 0.0
1989 7755 0.0 0.0 0.0
1990 7880 0.0 0.0 0.0
1991 7942 0.0 0.0 0.0
1992 6691 0.0 0.0 0.0
1993 8100 0.0 0.0 0.0
1994 7217 0.0 0.0 0.0
1995 8627 0.0 0.0 0.0
1996 8519 0.0 0.0 0.0
1997 8344 0.0 0.0 0.0
1998 8529 0.0 0.0 0.0
1999 7932 0.0 0.0 0.0
2000 8227 0.0 0.0 0.0
2001 8698 0.0 0.0 0.0
2002 8673 0.0 0.0 0.0
2003 8224 0.0 0.0 0.0
2004 2986 0.0 0.0 0.0

For data sources see[5]

References