If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224250712002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.859382,"lon":-113.464972,"icon":""}]} |
Location: 00/12-07-022-25W4/2 | |
Location Alias: 00/12-07-22-25 W4M | |
Location Alias 2: 00/12-07-022-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 25 | |
Section: 07 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-7-22-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0138891 | |
License Date: 1989-02-20 | |
License Status: Abandoned | |
Spud Date: 1989-02-22 | |
Final Drill Date: 1989-03-03 | |
Well Total Depth: 1835.00 m | |
Surface Hole Latitude: 50.859382 | |
Surface Hole Longitude: -113.464972 |
Date | Event |
---|---|
1989-02-20 | Obtained License |
1989-02-22 | Lost Circulation Occurred |
1989-02-23 | Surface Casing Operation Performed |
1989-03-03 | Finished Drilling |
1989-03-03 | Well Log Performed |
1989-03-03 | Well Mode changed to Drilled and Cased |
1989-03-04 | Production Casing Operation Performed |
1989-03-05 | Rig Released |
1989-05-23 | Well Log Performed |
1989-05-24 | Perforation Treatment Performed - Jet Perforation |
1989-05-24 | Well Log Performed |
1995-07-15 | Perforation Treatment Performed - Jet Perforation |
1995-07-15 | Well Log Performed |
1997-05-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-05-12 | Perforation Treatment Performed - Cement Squeeze |
1997-05-12 | Plug Back Performed |
1997-05-21 | Perforation Treatment Performed - Jet Perforation |
1997-05-21 | Well Log Performed |
1998-09-25 | Well Began Production |
1998-09-25 | Well Fluid changed to Gas |
1998-09-25 | Well Mode changed to Flowing |
1998-11-13 | Well Log Performed |
1998-11-15 | Perforation Treatment Performed - Jet Perforation |
1998-11-15 | Well Log Performed |
2001-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-01-23 | Plug Back Performed |
2001-01-23 | Well Fluid changed to Gas |
2001-01-23 | Well Mode changed to Abandoned Zone |
2001-01-24 | Perforation Treatment Performed - Jet Perforation |
2001-01-25 | Well Log Performed |
2001-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-10-01 | Plug Back Performed |
2001-10-02 | Well Log Performed |
2001-10-05 | Well Log Performed |
2002-03-14 | Perforation Treatment Performed - Jet Perforation |
2006-08-21 | Perforation Treatment Performed - Jet Perforation |
2006-08-22 | Perforation Treatment Performed - Remedial Casing |
2007-09-29 | Perforation Treatment Performed - Jet Perforation |
2007-10-04 | Perforation Treatment Performed - Fractured |
2007-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-12-05 | Plug Back Performed |
2008-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-25 | Plug Back Performed |
2008-10-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-05-24 | Perforation | 1805.50 | 1808.00 | 13 |
2001-10-01 | Packing Device Capped w/Cement | 870.00 | 878.00 | 0 |
2002-03-14 | Perforation | 884.50 | 890.00 | 20 |
2006-08-21 | Perforation | 395.00 | 396.00 | 17 |
2006-08-22 | Remedial Casing Cementing | 395.00 | 396.00 | 0 |
2007-09-29 | Perforation | 600.50 | 601.00 | 13 |
2007-09-29 | Perforation | 597.00 | 597.50 | 13 |
2007-09-29 | Perforation | 596.00 | 596.50 | 13 |
2007-09-29 | Perforation | 595.20 | 595.70 | 13 |
2007-09-29 | Perforation | 588.00 | 588.50 | 13 |
2007-09-29 | Perforation | 585.20 | 585.70 | 13 |
1995-07-15 | Perforation | 1805.00 | 1812.50 | 18 |
2007-09-29 | Perforation | 579.60 | 580.10 | 13 |
2007-09-29 | Perforation | 577.10 | 577.60 | 13 |
2007-09-29 | Perforation | 539.20 | 539.70 | 13 |
2007-09-29 | Perforation | 534.30 | 534.80 | 13 |
2007-09-29 | Perforation | 519.90 | 520.40 | 13 |
2007-09-29 | Perforation | 449.60 | 450.10 | 13 |
2007-09-29 | Perforation | 443.10 | 445.10 | 13 |
2007-09-29 | Perforation | 434.00 | 435.00 | 13 |
2007-09-29 | Perforation | 416.40 | 416.90 | 13 |
2007-09-29 | Perforation | 407.00 | 407.50 | 13 |
1997-05-12 | Acid Treatment | 1805.00 | 1812.50 | 0 |
2007-09-29 | Perforation | 405.90 | 406.90 | 13 |
2007-09-29 | Perforation | 400.10 | 400.60 | 13 |
2007-09-29 | Perforation | 389.30 | 392.30 | 13 |
2007-09-29 | Perforation | 374.60 | 375.10 | 13 |
2007-09-29 | Perforation | 367.10 | 367.60 | 13 |
2007-09-29 | Perforation | 334.50 | 335.00 | 13 |
2007-09-29 | Perforation | 330.00 | 331.00 | 13 |
2007-09-29 | Perforation | 317.60 | 318.10 | 13 |
2007-09-29 | Perforation | 310.90 | 311.40 | 13 |
2007-09-29 | Perforation | 296.00 | 296.50 | 13 |
1997-05-12 | Cement Squeeze | 1805.00 | 1812.50 | 0 |
2007-09-29 | Perforation | 288.30 | 288.80 | 13 |
2007-09-29 | Perforation | 273.50 | 274.00 | 13 |
2007-09-29 | Perforation | 250.10 | 250.60 | 13 |
2007-09-29 | Perforation | 223.80 | 224.30 | 13 |
2007-10-04 | Fracture | 223.80 | 601.00 | 0 |
2007-12-05 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2008-01-24 | Packing Device Capped w/Cement | 562.00 | 570.00 | 0 |
2008-01-24 | Packing Device Capped w/Cement | 507.00 | 515.00 | 0 |
2008-01-25 | Packing Device Capped w/Cement | 1.00 | 410.00 | 0 |
1997-05-21 | Perforation | 1793.50 | 1795.50 | 20 |
1998-11-15 | Perforation | 1793.50 | 1795.50 | 17 |
2001-01-23 | Packing Device Capped w/Cement | 1780.00 | 1790.00 | 0 |
2001-01-24 | Perforation | 887.00 | 890.00 | 20 |
2001-01-24 | Perforation | 884.50 | 887.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 870 | 0.0 | 0.0 | 0.0 |
1999 | 5824 | 0.0 | 0.0 | 0.0 |
2000 | 2423 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-02-22 | Lost Circulation | 70.00 | 106.00 |
For data sources see[6]