X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224250704000

Well Details

Well ID: 0224250704000
Loading map...
Location: 00/04-07-022-25W4/0
Location Alias: 00/04-07-22-25 W4M
Location Alias 2: 00/04-07-022-25 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 25
Section: 07
County/Municipality: Wheatland County
Well Name: ANTERRA ENTICE 4-7-22-25
Operator Name: Anterra Energy Inc.
License Number: 0141124
License Date: 1989-10-02
License Status: Abandoned
Spud Date: 1989-10-13
Final Drill Date: 1989-10-27
Well Total Depth: 1926.00 m
Surface Hole Latitude: 50.855773
Surface Hole Longitude: -113.462386

For data sources see[1][2]

Well History

Date Event
1989-10-02 Obtained License
1989-10-14 Surface Casing Operation Performed
1989-10-15 Direction Drilling Operation Performed - Deviate
1989-10-27 Finished Drilling
1989-10-27 Well Log Performed
1989-10-27 Well Mode changed to Drilled and Cased
1989-10-30 Production Casing Operation Performed
1989-10-30 Rig Released
1989-11-02 Well Log Performed
1989-11-16 Well Log Performed
1989-11-17 Well Log Performed
1989-11-18 Perforation Treatment Performed - Jet Perforation
1990-01-17 Well Began Production
1990-01-17 Well Fluid changed to Crude Oil
1990-01-17 Well Mode changed to Pumping
1992-05-14 Perforation Treatment Performed - Jet Perforation
1992-05-14 Well Log Performed
1995-07-19 Perforation Treatment Performed - Jet Perforation
1995-07-19 Well Log Performed
2006-02-25 Well Fluid changed to Crude Oil
2006-02-25 Well Mode changed to Suspended
2018-11-07 Well Log Performed
2018-11-08 Well Log Performed
2018-11-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2018-11-09 Perforation Treatment Performed - Cement Plug
2018-11-09 Perforation Treatment Performed - Cement Squeeze
2018-11-09 Plug Back Performed
2018-11-09 Well Fluid changed to Crude Oil
2018-11-09 Well Mode changed to Abandoned Zone
2018-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-10 Plug Back Performed
2019-05-24 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-10-15 649.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-18 Perforation 1895.00 1897.50 14
2018-11-09 Cement Squeeze 468.00 468.10 0
2018-11-09 Cement Squeeze 344.00 344.10 0
2018-11-09 Cement Plug 369.00 656.00 0
2018-11-10 Packing Device Capped w/Cement 267.00 337.00 0
1992-05-14 Perforation 1892.00 1895.00 14
1995-07-19 Perforation 1892.00 1900.00 18
2018-11-09 Hydra Jet Perforation 635.00 635.10 0
2018-11-09 Hydra Jet Perforation 526.00 526.10 0
2018-11-09 Hydra Jet Perforation 468.00 468.10 0
2018-11-09 Hydra Jet Perforation 344.00 344.10 0
2018-11-09 Cement Squeeze 635.00 635.10 0
2018-11-09 Cement Squeeze 526.00 526.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 6463 0.0 0.0 0.0
1991 7774 0.0 0.0 0.0
1992 8223 0.0 0.0 0.0
1993 8097 0.0 0.0 0.0
1994 8426 0.0 0.0 0.0
1995 7674 0.0 0.0 0.0
1996 6886 0.0 0.0 0.0
1997 6811 0.0 0.0 0.0
1998 6713 0.0 0.0 0.0
1999 7780 0.0 0.0 0.0
2000 4839 0.0 0.0 0.0
2001 7124 0.0 0.0 0.0
2003 168 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References