X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224210408000

Well Details

Well ID: 0224210408000
Loading map...
Location: 00/08-04-022-21W4/0
Location Alias: 00/08-04-22-21 W4M
Location Alias 2: 00/08-04-022-21 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 21
Section: 04
County/Municipality: Wheatland County
Well Name: ECA ECOG GLEICHEN 8-4-22-21
Operator Name: Lynx Energy ULC
License Number: 0287088
License Date: 2003-05-12
License Status: Issued
Spud Date: 2003-07-14
Final Drill Date: 2003-07-17
Well Total Depth: 851.00 m
Surface Hole Latitude: 50.841181
Surface Hole Longitude: -112.845891

For data sources see[1][2]

Well History

Date Event
2003-05-12 Obtained License
2003-07-16 Surface Casing Operation Performed
2003-07-17 Finished Drilling
2003-07-17 Production Casing Operation Performed
2003-07-17 Rig Released
2003-07-17 Well Mode changed to Drilled and Cased
2003-07-25 Well Log Performed
2003-08-21 Perforation Treatment Performed - Jet Perforation
2003-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-07 Perforation Treatment Performed - Jet Perforation
2003-09-07 Plug Back Performed
2003-09-07 Well Mode changed to Abandoned Zone
2003-09-20 Perforation Treatment Performed - Fractured
2003-10-04 Perforation Treatment Performed - Jet Perforation
2012-06-01 Perforation Treatment Performed - Jet Perforation
2015-05-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-21 Perforation 821.00 826.00 13
2015-05-26 Perforation 180.00 184.00 13
2015-05-26 Perforation 196.00 198.00 13
2015-05-26 Perforation 218.00 220.00 13
2015-05-26 Perforation 518.00 519.00 13
2015-05-26 Perforation 539.00 541.00 13
2015-05-26 Perforation 573.00 575.00 13
2015-05-26 Perforation 581.00 582.00 13
2015-05-26 Perforation 590.00 592.00 13
2015-05-26 Perforation 612.00 614.00 13
2003-09-07 Packing Device Capped w/Cement 807.00 815.00 0
2003-09-07 Perforation 643.00 644.00 13
2003-09-07 Perforation 652.00 656.50 13
2003-09-20 Fracture 652.00 656.50 0
2003-10-04 Perforation 529.00 530.00 13
2003-10-04 Perforation 532.00 533.00 13
2012-06-01 Perforation 564.00 566.00 13
2012-06-01 Perforation 551.00 553.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-03 No Incident Encountered 0.00 0.00
2015-05-27 No Incident Encountered 0.00 0.00

For data sources see[5]

References