X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224140606000

Well Details

Well ID: 0224140606000
Loading map...
Location: 00/06-06-022-14W4/0
Location Alias: 00/06-06-22-14 W4M
Location Alias 2: 00/06-06-022-14 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 14
Section: 06
County/Municipality: County of Newell
Well Name: CPOG VERGER 6-6-22-14
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0024006
License Date: 1963-03-22
License Status: RecCertified
Spud Date: 1963-05-19
Final Drill Date: 1963-05-26
Well Total Depth: 1048.50 m
Surface Hole Latitude: 50.839942
Surface Hole Longitude: -111.934761

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-22 Obtained License
1963-05-25 Drill Stem Test Performed
1963-05-26 Finished Drilling
1963-05-26 Well Mode changed to Drilled and Cased
1963-05-27 Drill Stem Test Performed
1963-05-27 Production Casing Operation Performed
1964-04-11 Perforation Treatment Performed - Bullet Perforation
1964-11-12 Well Began Production
1964-11-12 Well Fluid changed to Gas
1964-11-12 Well Mode changed to Flowing
1965-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-27 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-28 Perforation Treatment Performed - Cement Squeeze
1965-12-02 Perforation Treatment Performed - Bullet Perforation
1965-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-04 Perforation Treatment Performed - Acid Wash - No Pressure
1967-10-24 Perforation Treatment Performed - Cement Plug
1967-10-25 Well Abandoned
1967-10-25 Well Fluid changed to Gas
1967-10-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-11 Bullet Perforation 1013.80 1015.30 13
1965-06-29 Acid Treatment 1013.80 1015.30 0
1965-11-27 Hydra Jet Perforation 1020.50 1020.50 0
1965-11-28 Acid Treatment 1020.50 1020.50 0
1965-11-28 Cement Squeeze 1013.80 1020.50 0
1965-12-02 Bullet Perforation 1015.00 1015.60 13
1965-12-04 Acid Wash 1015.00 1015.60 0
1965-12-04 Acid Treatment 1015.00 1015.60 0
1967-10-24 Cement Plug 990.60 999.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References