X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224093612002

Well Details

Well ID: 0224093612002
Loading map...
Location: 00/12-36-022-09W4/2
Location Alias: 00/12-36-22-09 W4M
Location Alias 2: 00/12-36-022-09 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 09
Section: 36
County/Municipality: Special Areas No. 3
Well Name: CNRL JENNER 12-36-22-9
Operator Name: Canadian Natural Resources Limited
License Number: 0144724
License Date: 1990-07-09
License Status: Abandoned
Spud Date: 1990-07-31
Final Drill Date: 1990-08-03
Well Total Depth: 950.00 m
Surface Hole Latitude: 50.914868
Surface Hole Longitude: -111.130581

For data sources see[1][2]

Well History

Date Event
1990-07-09 Obtained License
1990-08-01 Surface Casing Operation Performed
1990-08-03 Finished Drilling
1990-08-03 Well Log Performed
1990-08-04 Drill Stem Test Performed
1990-08-04 Well Log Performed
1990-08-05 Production Casing Operation Performed
1990-08-05 Rig Released
1990-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-15 Perforation Treatment Performed - Jet Perforation
1990-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-17 Perforation Treatment Performed - Jet Perforation
1990-08-17 Plug Back Performed
1990-10-24 Perforation Treatment Performed - Cement Squeeze
1990-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-27 Perforation Treatment Performed - Jet Perforation
1990-10-27 Plug Back Performed
1990-10-28 Perforation Treatment Performed - Jet Perforation
1990-10-28 Well Mode changed to Drilled and Cased
1990-11-01 Well Fluid changed to Gas
1990-11-01 Well Mode changed to Testing
1999-10-27 Perforation Treatment Performed - Jet Perforation
1999-10-28 Perforation Treatment Performed - Fractured
2007-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-06-13 Plug Back Performed
2007-06-13 Well Fluid changed to Gas
2007-06-13 Well Mode changed to Abandoned Zone
2010-08-06 Perforation Treatment Performed - Jet Perforation
2010-08-07 Well Log Performed
2010-08-08 Well Log Performed
2010-08-10 Perforation Treatment Performed - Jet Perforation
2010-08-10 Well Log Performed
2010-08-11 Perforation Treatment Performed - Jet Perforation
2010-08-11 Well Log Performed
2010-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-16 Perforation Treatment Performed - Jet Perforation
2010-08-16 Well Log Performed
2010-08-18 Perforation Treatment Performed - Jet Perforation
2010-08-18 Well Log Performed
2010-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-19 Perforation Treatment Performed - Remedial Casing
2010-08-19 Well Log Performed
2010-08-24 Perforation Treatment Performed - Remedial Casing
2010-08-26 Perforation Treatment Performed - Remedial Casing
2011-10-24 Well Log Performed
2011-10-25 Perforation Treatment Performed - Jet Perforation
2011-10-25 Well Log Performed
2011-10-27 Perforation Treatment Performed - Remedial Casing
2011-10-28 Perforation Treatment Performed - Jet Perforation
2011-10-28 Well Log Performed
2011-10-30 Perforation Treatment Performed - Remedial Casing
2011-10-31 Well Log Performed
2011-11-01 Perforation Treatment Performed - Jet Perforation
2011-11-01 Well Log Performed
2011-11-04 Perforation Treatment Performed - Cement Plug
2011-11-04 Perforation Treatment Performed - Remedial Casing
2011-11-05 Perforation Treatment Performed - Jet Perforation
2011-11-05 Well Log Performed
2011-11-07 Perforation Treatment Performed - Remedial Casing
2011-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-13 Perforation Treatment Performed - Jet Perforation
2011-11-13 Well Log Performed
2011-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-15 Perforation Treatment Performed - Remedial Casing
2012-01-04 Well Abandoned
2012-01-04 Well Fluid changed to Gas
2012-01-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-15 Perforation 925.00 928.00 13
1990-10-28 Perforation 894.00 895.50 13
1999-10-27 Perforation 381.00 386.00 13
1999-10-27 Perforation 351.00 353.00 13
1999-10-27 Perforation 323.00 328.00 13
1999-10-27 Perforation 314.00 315.50 13
1999-10-28 Fracture 314.00 386.00 0
2007-06-13 Packing Device Capped w/Cement 847.50 885.50 0
2007-06-13 Packing Device Capped w/Cement 302.00 310.00 0
2010-08-06 Perforation 314.00 386.00 13
2010-08-06 Perforation 894.00 895.50 13
1990-08-15 Acid Treatment 925.00 928.00 0
2010-08-10 Perforation 744.00 746.00 13
2010-08-11 Perforation 754.80 756.80 13
2010-08-16 Acid Treatment 744.00 746.00 0
2010-08-16 Acid Treatment 754.80 756.80 0
2010-08-16 Perforation 862.50 863.50 13
2010-08-18 Perforation 862.00 864.00 13
2010-08-18 Perforation 864.00 866.00 13
2010-08-19 Remedial Casing Cementing 862.00 866.00 0
2010-08-19 Packing Device Capped w/Cement 849.00 860.00 0
2010-08-24 Remedial Casing Cementing 754.80 756.80 0
1990-08-17 Packing Device Capped w/Cement 914.00 922.00 0
2010-08-26 Remedial Casing Cementing 744.00 746.00 0
2011-10-25 Perforation 565.00 568.00 20
2011-10-25 Perforation 565.00 566.00 99
2011-10-27 Remedial Casing Cementing 565.00 568.00 0
2011-10-28 Perforation 489.00 492.00 20
2011-10-28 Perforation 489.00 489.90 99
2011-10-30 Remedial Casing Cementing 489.00 492.00 0
2011-11-01 Perforation 312.00 315.00 20
2011-11-01 Perforation 312.00 312.90 99
2011-11-04 Cement Plug 320.00 405.00 0
1990-08-17 Perforation 902.00 904.00 13
2011-11-04 Remedial Casing Cementing 312.00 315.00 0
2011-11-05 Perforation 202.00 205.00 20
2011-11-05 Perforation 202.00 202.90 99
2011-11-07 Remedial Casing Cementing 202.00 205.00 0
2011-11-13 Packing Device Capped w/Cement 191.00 199.00 0
2011-11-13 Perforation 188.00 191.00 20
2011-11-15 Remedial Casing Cementing 188.00 191.00 0
2011-11-15 Packing Device Capped w/Cement 174.00 185.50 0
1990-10-24 Cement Squeeze 902.00 904.00 0
1990-10-27 Perforation 902.00 903.00 13
1990-10-27 Perforation 903.00 904.00 13
1990-10-27 Packing Device Capped w/Cement 898.00 901.00 0
1990-10-28 Perforation 894.00 895.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 111 0.0 0.0 0.0
1991 23 0.0 0.0 0.0

For data sources see[5]

References