X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224092108030

Well Details

Well ID: 0224092108030
Loading map...
Location: 03/08-21-022-09W4/0
Location Alias: 03/08-21-22-09 W4M
Location Alias 2: 03/08-21-022-09 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 09
Section: 21
County/Municipality: Special Areas No. 3
Well Name: ARC JENNER 8-21-22-9
Operator Name: Canadian Natural Resources Limited
License Number: 0251645
License Date: 2001-02-22
License Status: Suspension
Spud Date: 2001-03-07
Final Drill Date: 2001-03-08
Well Total Depth: 588.00 m
Surface Hole Latitude: 50.884786
Surface Hole Longitude: -111.183124

For data sources see[1][2]

Well History

Date Event
2001-02-22 Obtained License
2001-03-08 Finished Drilling
2001-03-08 Surface Casing Operation Performed
2001-03-09 Production Casing Operation Performed
2001-03-09 Rig Released
2001-03-09 Well Mode changed to Drilled and Cased
2001-03-17 Well Log Performed
2001-03-22 Perforation Treatment Performed - Jet Perforation
2001-03-25 Perforation Treatment Performed - Fractured
2001-09-18 Well Began Production
2001-09-18 Well Fluid changed to Gas
2001-09-18 Well Mode changed to Flowing
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended
2010-06-11 Well Fluid changed to Gas
2010-06-11 Well Mode changed to Flowing
2018-11-30 Well Fluid changed to Gas
2018-11-30 Well Mode changed to Suspended
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-22 Perforation 385.00 387.00 7
2001-03-25 Fracture 408.50 409.50 0
2001-03-25 Fracture 423.00 425.00 0
2001-03-25 Fracture 434.50 437.50 0
2001-03-25 Fracture 443.00 444.00 0
2001-03-25 Fracture 495.50 497.50 0
2001-03-22 Perforation 392.00 394.00 7
2001-03-22 Perforation 408.50 409.50 7
2001-03-22 Perforation 423.00 425.00 7
2001-03-22 Perforation 434.50 437.50 7
2001-03-22 Perforation 443.00 444.00 7
2001-03-22 Perforation 495.50 497.50 7
2001-03-25 Fracture 385.00 387.00 0
2001-03-25 Fracture 392.00 394.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2513 0.0 0.0 0.0
2002 8752 0.0 0.0 0.0
2003 8754 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 8714 0.0 0.0 0.0
2007 8694 0.0 0.0 0.0
2008 8741 0.0 0.0 0.0
2009 3623 0.0 0.0 0.0
2010 4776 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8656 0.0 0.0 0.0
2013 7239 0.0 0.0 0.0
2014 8609 0.0 0.0 0.0
2015 8649 0.0 0.0 0.0
2016 8677 0.0 0.0 0.0
2017 5159 0.0 0.0 0.0
2018 3442 0.0 0.0 0.0
2019 550 0.0 0.0 0.0
2020 1420 0.0 0.0 0.0

For data sources see[5]

References