If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224062006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.882088,"lon":-110.80301,"icon":""}]} |
Location: 00/06-20-022-06W4/0 | |
Location Alias: 00/06-20-22-06 W4M | |
Location Alias 2: 00/06-20-022-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 06 | |
Section: 20 | |
County/Municipality: Special Areas No. 3 | |
Well Name: CNRL ATL-BUFF 6-20-22-6 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0153175 | |
License Date: 1992-07-22 | |
License Status: Abandoned | |
Spud Date: 1992-08-04 | |
Final Drill Date: 1992-08-07 | |
Well Total Depth: 809.00 m | |
Surface Hole Latitude: 50.882088 | |
Surface Hole Longitude: -110.803010 |
Date | Event |
---|---|
1992-07-22 | Obtained License |
1992-08-05 | Surface Casing Operation Performed |
1992-08-07 | Finished Drilling |
1992-08-07 | Production Casing Operation Performed |
1992-08-07 | Well Log Performed |
1992-08-08 | Rig Released |
1992-08-11 | Perforation Treatment Performed - Jet Perforation |
1992-08-12 | Perforation Treatment Performed - Jet Perforation |
1992-08-12 | Perforation Treatment Performed - Remedial Casing |
1992-08-13 | Perforation Treatment Performed - Jet Perforation |
1992-08-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-08-14 | Plug Back Performed |
1992-08-14 | Well Abandoned |
1992-08-14 | Well Mode changed to Abandoned |
1992-10-08 | Perforation Treatment Performed - Jet Perforation |
1992-10-08 | Perforation Treatment Performed - Remedial Casing |
1992-11-06 | Perforation Treatment Performed - Jet Perforation |
1992-11-06 | Perforation Treatment Performed - Remedial Casing |
2012-12-08 | Perforation Treatment Performed - Jet Perforation |
2012-12-08 | Well Log Performed |
2012-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-12-15 | Perforation Treatment Performed - Remedial Casing |
2012-12-20 | Perforation Treatment Performed - Jet Perforation |
2012-12-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-12-21 | Perforation Treatment Performed - Remedial Casing |
2013-01-04 | Perforation Treatment Performed - Jet Perforation |
2013-01-04 | Well Log Performed |
2013-01-06 | Perforation Treatment Performed - Remedial Casing |
2013-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-01-09 | Well Log Performed |
2013-01-10 | Perforation Treatment Performed - Jet Perforation |
2013-01-10 | Well Log Performed |
2013-01-11 | Perforation Treatment Performed - Remedial Casing |
2013-01-13 | Well Log Performed |
2013-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-01-15 | Perforation Treatment Performed - Jet Perforation |
2013-01-15 | Well Log Performed |
2013-01-16 | Perforation Treatment Performed - Jet Perforation |
2013-01-16 | Well Log Performed |
2013-01-18 | Perforation Treatment Performed - Remedial Casing |
2013-01-20 | Perforation Treatment Performed - Jet Perforation |
2013-01-20 | Well Log Performed |
2013-01-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-01-21 | Perforation Treatment Performed - Remedial Casing |
2013-01-21 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-08-11 | Perforation | 355.00 | 356.00 | 13 |
2012-12-08 | Perforation | 719.00 | 722.00 | 20 |
2012-12-11 | Acid Treatment | 719.00 | 722.00 | 0 |
2012-12-12 | Acid Treatment | 719.00 | 722.00 | 0 |
2012-12-15 | Remedial Casing Cementing | 719.00 | 722.00 | 0 |
2012-12-15 | Packing Device Capped w/Cement | 675.00 | 714.00 | 0 |
2012-12-20 | Perforation | 423.00 | 426.00 | 20 |
2012-12-20 | Perforation | 423.00 | 426.00 | 17 |
2012-12-21 | Remedial Casing Cementing | 423.00 | 426.00 | 0 |
2012-12-21 | Packing Device Capped w/Cement | 407.00 | 420.00 | 0 |
2013-01-04 | Perforation | 353.00 | 356.00 | 20 |
1992-08-12 | Perforation | 340.00 | 341.00 | 13 |
2013-01-04 | Perforation | 353.00 | 356.00 | 17 |
2013-01-06 | Remedial Casing Cementing | 353.00 | 356.00 | 0 |
2013-01-09 | Packing Device Capped w/Cement | 340.50 | 348.50 | 0 |
2013-01-09 | Packing Device Capped w/Cement | 327.00 | 335.00 | 0 |
2013-01-10 | Perforation | 295.00 | 298.00 | 20 |
2013-01-10 | Perforation | 295.00 | 298.00 | 17 |
2013-01-11 | Remedial Casing Cementing | 295.00 | 298.00 | 0 |
2013-01-15 | Packing Device Capped w/Cement | 285.00 | 293.00 | 0 |
2013-01-15 | Perforation | 185.00 | 188.00 | 20 |
2013-01-15 | Perforation | 185.00 | 188.00 | 17 |
1992-08-12 | Remedial Casing Cementing | 340.00 | 356.00 | 0 |
2013-01-16 | Perforation | 215.00 | 217.00 | 20 |
2013-01-18 | Remedial Casing Cementing | 215.00 | 217.00 | 0 |
2013-01-20 | Perforation | 185.00 | 186.00 | 17 |
2013-01-21 | Remedial Casing Cementing | 185.00 | 188.00 | 0 |
2013-01-21 | Packing Device Capped w/Cement | 125.00 | 189.90 | 0 |
1992-08-13 | Perforation | 789.00 | 790.50 | 13 |
1992-08-14 | Packing Device Capped w/Cement | 777.00 | 785.00 | 0 |
1992-10-08 | Perforation | 201.00 | 202.00 | 13 |
1992-10-08 | Remedial Casing Cementing | 201.00 | 202.00 | 0 |
1992-11-06 | Perforation | 191.00 | 191.30 | 13 |
1992-11-06 | Remedial Casing Cementing | 191.00 | 191.30 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]