X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224061506000

Well Details

Well ID: 0224061506000
Loading map...
Location: 00/06-15-022-06W4/0
Location Alias: 00/06-15-22-06 W4M
Location Alias 2: 00/06-15-022-06 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 06
Section: 15
County/Municipality: Special Areas No. 3
Well Name: CITY OF MEDH ATL-BUFF 6-15-22-6
Operator Name: City Of Medicine Hat
License Number: 0359345
License Date: 2006-06-22
License Status: Suspension
Spud Date: 2006-06-30
Final Drill Date: 2006-07-02
Well Total Depth: 449.00 m
Surface Hole Latitude: 50.868502
Surface Hole Longitude: -110.757649

For data sources see[1][2]

Well History

Date Event
2006-06-22 Obtained License
2006-07-01 Surface Casing Operation Performed
2006-07-02 Finished Drilling
2006-07-02 Production Casing Operation Performed
2006-07-02 Rig Released
2006-07-02 Well Mode changed to Drilled and Cased
2006-11-07 Well Log Performed
2006-11-13 Perforation Treatment Performed - Jet Perforation
2006-11-16 Perforation Treatment Performed - Fractured
2006-11-19 Perforation Treatment Performed - Jet Perforation
2006-11-20 Perforation Treatment Performed - Fractured
2006-11-24 Perforation Treatment Performed - Jet Perforation
2006-11-25 Perforation Treatment Performed - Fractured
2007-01-18 Well Began Production
2007-01-18 Well Fluid changed to Gas
2007-01-18 Well Mode changed to Flowing
2018-12-21 Well Fluid changed to Gas
2018-12-21 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-11-13 Perforation 378.00 383.00 13
2006-11-20 Fracture 309.00 310.00 0
2006-11-24 Perforation 299.00 302.00 7
2006-11-24 Perforation 291.50 294.50 7
2006-11-25 Fracture 299.00 302.00 0
2006-11-25 Fracture 291.50 294.50 0
2006-11-16 Fracture 378.00 383.00 0
2006-11-19 Perforation 324.00 326.00 7
2006-11-19 Perforation 318.00 321.00 7
2006-11-19 Perforation 311.00 312.00 7
2006-11-19 Perforation 309.00 310.00 7
2006-11-20 Fracture 324.00 326.00 0
2006-11-20 Fracture 318.00 321.00 0
2006-11-20 Fracture 311.00 312.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 8255 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 8707 0.0 0.0 0.0
2010 8708 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 8474 0.0 0.0 0.0
2013 8247 0.0 0.0 0.0
2014 6276 0.0 0.0 0.0
2016 8738 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 720 0.0 0.0 0.0

For data sources see[5]

References