X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224052806002

Well Details

Well ID: 0224052806002
Loading map...
Location: 00/06-28-022-05W4/2
Location Alias: 00/06-28-22-05 W4M
Location Alias 2: 00/06-28-022-05 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 05
Section: 28
County/Municipality: Special Areas No. 3
Well Name: PW GAS BIND 6-28-22-5
Operator Name: TAQA North Ltd.
License Number: 0008592
License Date: 1954-10-18
License Status: Suspension
Spud Date: 1954-11-23
Final Drill Date: 1954-12-10
Well Total Depth: 923.50 m
Surface Hole Latitude: 50.898087
Surface Hole Longitude: -110.642295

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-18 Obtained License
1954-11-30 Drill Stem Test Performed
1954-12-01 Drill Stem Test Performed
1954-12-02 Drill Stem Test Performed
1954-12-03 Drill Stem Test Performed
1954-12-04 Drill Stem Test Performed
1954-12-08 Drill Stem Test Performed
1954-12-09 Drill Stem Test Performed
1954-12-10 Finished Drilling
1954-12-10 Production Casing Operation Performed
1954-12-11 Drill Stem Test Performed
1979-11-30 Perforation Treatment Performed - Jet Perforation
1982-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-22 Perforation Treatment Performed - Jet Perforation
1982-09-22 Plug Back Performed
1983-07-27 Well Mode changed to Drilled and Cased
1997-07-24 Perforation Treatment Performed - Jet Perforation
1997-07-25 Well Log Performed
1997-07-29 Perforation Treatment Performed - Fractured
1997-08-26 Perforation Treatment Performed - Jet Perforation
1997-08-26 Well Log Performed
1997-10-01 Well Mode changed to Drilled and Cased
1997-11-07 Well Began Production
1997-11-07 Well Fluid changed to Gas
1997-11-07 Well Mode changed to Flowing
2005-12-29 Well Fluid changed to Gas
2005-12-29 Well Mode changed to Suspended
2015-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-13 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2015-09-13 Plug Back Performed
2015-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-14 Plug Back Performed
2015-09-14 Well Fluid changed to Gas
2015-09-14 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-30 Perforation 899.80 901.30 13
2015-09-14 Packing Device Capped w/Cement 725.00 733.00 0
1982-09-22 Packing Device Capped w/Cement 881.00 889.00 0
1982-09-22 Perforation 745.50 749.00 13
1997-07-24 Perforation 899.80 901.30 13
1997-07-29 Fracture 899.80 901.30 0
1997-08-26 Perforation 747.50 751.00 18
1997-08-26 Perforation 752.50 755.50 18
2015-09-13 Packing Dev Cpd w/Res-Gyp Cem 904.00 907.00 0
2015-09-13 Packing Device Capped w/Cement 880.00 888.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 964 0.0 0.0 0.0
1998 6050 0.0 0.0 0.0
1999 8418 0.0 0.0 0.0
2000 7053 0.0 0.0 0.0
2001 7300 0.0 0.0 0.0
2002 7510 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 6642 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-02 No Incident Encountered 0.00 0.00
2015-09-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References