X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224040308000

Well Details

Well ID: 0224040308000
Loading map...
Location: 00/08-03-022-04W4/0
Location Alias: 00/08-03-22-04 W4M
Location Alias 2: 00/08-03-022-04 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 04
Section: 03
County/Municipality: Special Areas No. 2
Well Name: HIGHFIELD NYO BINDLOSS 8-3-22-4
Operator Name: Devon Canada Corporation
License Number: 0066341
License Date: 1977-10-25
License Status: RecCertified
Spud Date: 1977-11-02
Final Drill Date: 1977-11-04
Well Total Depth: 467.30 m
Surface Hole Latitude: 50.839595
Surface Hole Longitude: -110.467112

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-25 Obtained License
1977-11-04 Finished Drilling
1977-11-04 Production Casing Operation Performed
1977-11-04 Well Mode changed to Drilled and Cased
1977-11-17 Perforation Treatment Performed - Jet Perforation
1977-11-18 Perforation Treatment Performed - Fractured
1977-11-26 Perforation Treatment Performed - Jet Perforation
1977-11-26 Perforation Treatment Performed - Selective Jet Perforations
1977-11-30 Perforation Treatment Performed - Fractured
1977-12-07 Well Began Production
1977-12-07 Well Fluid changed to Gas
1977-12-07 Well Mode changed to Flowing
1986-09-10 Well Log Performed
1986-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-09-11 Plug Back Performed
1986-09-11 Well Fluid changed to Gas
1986-09-11 Well Mode changed to Abandoned
1986-09-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-17 Perforation 447.40 449.30 7
1977-11-18 Fracture 447.40 449.30 0
1977-11-26 Selective Jet Perforations 357.80 358.40 0
1977-11-26 Selective Jet Perforations 358.70 359.40 0
1977-11-26 Selective Jet Perforations 360.00 363.60 0
1977-11-26 Perforation 367.60 368.50 3
1977-11-26 Perforation 382.20 383.40 3
1977-11-30 Fracture 357.80 383.40 0
1986-09-11 Packing Device Capped w/Cement 339.00 347.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 589 0.0 0.0 0.0
1978 7460 0.0 0.0 0.0
1979 5886 0.0 0.0 0.0
1980 7024 0.0 0.0 0.0
1981 6314 0.0 0.0 0.0
1982 7113 0.0 0.0 0.0
1983 2661 0.0 0.0 0.0
1984 1486 0.0 0.0 0.0
1985 5111 0.0 0.0 0.0
1986 1977 0.0 0.0 0.0

For data sources see[5]

References