X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224021204000

Well Details

Well ID: 0224021204000
Loading map...
Location: 00/04-12-022-02W4/0
Location Alias: 00/04-12-22-02 W4M
Location Alias 2: 00/04-12-022-02 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 02
Section: 12
County/Municipality: Special Areas No. 2
Well Name: CITY OF MEDH MEDHAT 4-12-22-2
Operator Name: City Of Medicine Hat
License Number: 0320869
License Date: 2004-12-04
License Status: RecCertified
Spud Date: 2005-05-06
Final Drill Date: 2005-05-07
Well Total Depth: 526.00 m
Surface Hole Latitude: 50.851612
Surface Hole Longitude: -110.161222

For data sources see[1][2]

Well History

Date Event
2004-12-04 Obtained License
2005-03-15 Well Log Performed
2005-05-06 Surface Casing Operation Performed
2005-05-07 Finished Drilling
2005-05-07 Production Casing Operation Performed
2005-05-07 Rig Released
2005-05-07 Well Mode changed to Drilled and Cased
2005-05-17 Perforation Treatment Performed - Jet Perforation
2005-05-18 Perforation Treatment Performed - Fractured
2005-05-24 Perforation Treatment Performed - Jet Perforation
2005-05-25 Perforation Treatment Performed - Fractured
2005-05-28 Perforation Treatment Performed - Jet Perforation
2005-05-29 Perforation Treatment Performed - Fractured
2005-08-03 Well Began Production
2005-08-03 Well Fluid changed to Gas
2005-08-03 Well Mode changed to Flowing
2013-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-16 Plug Back Performed
2013-08-16 Well Fluid changed to Gas
2013-08-16 Well Mode changed to Abandoned Zone
2013-08-29 Well Abandoned
2013-08-29 Well Fluid changed to Gas
2013-08-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-17 Perforation 476.00 479.00 13
2005-05-29 Fracture 395.00 397.00 0
2013-08-16 Packing Device Capped w/Cement 456.00 464.00 0
2013-08-16 Packing Device Capped w/Cement 365.00 373.00 0
2005-05-18 Fracture 476.00 479.00 0
2005-05-24 Perforation 408.00 413.00 7
2005-05-25 Fracture 408.00 413.00 0
2005-05-28 Perforation 383.00 387.00 7
2005-05-28 Perforation 389.00 393.00 7
2005-05-28 Perforation 395.00 397.00 7
2005-05-29 Fracture 383.00 387.00 0
2005-05-29 Fracture 389.00 393.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3573 0.0 0.0 0.0
2006 8295 0.0 0.0 0.0
2007 8553 0.0 0.0 0.0
2008 8676 0.0 0.0 0.0
2009 8708 0.0 0.0 0.0
2010 8665 0.0 0.0 0.0
2011 8473 0.0 0.0 0.0
2012 8716 0.0 0.0 0.0
2013 5311 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References