If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0215030501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.748534,"lon":-114.374065,"icon":""}]} |
Location: 00/01-05-021-03W5/0 | |
Location Alias: 00/01-05-21-03 W5M | |
Location Alias 2: 00/01-05-021-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 5 | |
Range: 03 | |
Section: 05 | |
County/Municipality: Foothills County | |
Well Name: HOME 19 TV6 IN 1-5-21-3 | |
Operator Name: Devon Canada Corporation | |
License Number: B0000538 | |
License Date: 1943-11-12 | |
License Status: RecCertified | |
Spud Date: 1943-12-05 | |
Final Drill Date: 1944-07-19 | |
Well Total Depth: 2586.20 m | |
Surface Hole Latitude: 50.748534 | |
Surface Hole Longitude: -114.374065 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1943-11-12 | Obtained License |
1944-06-27 | Production Casing Operation Performed |
1944-07-19 | Finished Drilling |
1944-07-19 | Perforation Treatment Performed - Open-Hole Completion |
1944-07-19 | Well Mode changed to Drilled and Cased |
1944-07-20 | Well Began Production |
1944-07-20 | Well Fluid changed to Crude Oil |
1944-07-20 | Well Mode changed to Flowing |
1944-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1944-08-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
1946-06-01 | Production Casing Operation Performed |
1961-06-05 | Liner Casing Operation Performed |
1961-06-05 | Perforation Treatment Performed - Cement Squeeze |
1961-06-05 | Perforation Treatment Performed - Open-Hole Completion |
1961-06-05 | Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug |
1961-10-06 | Well Fluid changed to Crude Oil |
1961-10-06 | Well Mode changed to Gas Lift |
1962-12-03 | Well Fluid changed to Crude Oil |
1962-12-03 | Well Mode changed to Suspended |
1967-03-08 | Well Began Injection |
1967-03-08 | Well Fluid changed to Water |
1967-03-08 | Well Type changed to Injection |
1992-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-08-29 | Plug Back Performed |
1992-08-29 | Well Fluid changed to Water |
1992-08-29 | Well Mode changed to Abandoned |
1992-08-29 | Well Type changed to Injection |
1992-10-03 | Perforation Treatment Performed - Jet Perforation |
1992-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-10-04 | Plug Back Performed |
1992-10-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1944-07-19 | Open Hole/Barefoot Completion | 2453.60 | 2586.20 | 0 |
1992-10-03 | Perforation | 31.00 | 31.30 | 0 |
1992-10-04 | Packing Device Capped w/Cement | 2.80 | 28.50 | 0 |
1944-07-31 | Acid Treatment | 2561.80 | 2581.70 | 0 |
1944-08-02 | Acid Wash | 2481.10 | 2581.70 | 0 |
1961-06-05 | Resin-Gypsum Squeeze or Plug | 2542.00 | 2545.10 | 0 |
1961-06-05 | Cement Squeeze | 2513.60 | 2542.30 | 0 |
1961-06-05 | Open Hole/Barefoot Completion | 2453.60 | 2513.60 | 0 |
1992-08-29 | Packing Device Capped w/Cement | 2401.10 | 2410.00 | 0 |
1992-10-03 | Perforation | 152.00 | 152.30 | 7 |
1992-10-03 | Perforation | 102.50 | 102.80 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]