X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0215030402002

Well Details

Well ID: 0215030402002
Loading map...
Location: 00/02-04-021-03W5/2
Location Alias: 00/02-04-21-03 W5M
Location Alias 2: 00/02-04-021-03 W5/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 5
Range: 03
Section: 04
County/Municipality: Foothills County
Well Name: CNRL TV 2-4-21-3
Operator Name: Canadian Natural Resources Limited
License Number: B0000216
License Date: 1941-08-14
License Status: Abandoned
Spud Date: 1941-08-25
Final Drill Date: 1942-07-08
Well Total Depth: 2545.70 m
Surface Hole Latitude: 50.748544
Surface Hole Longitude: -114.356732

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1941-08-14 Obtained License
1941-08-25 Direction Drilling Operation Performed - 98
1942-07-08 Finished Drilling
1942-07-08 Perforation Treatment Performed - Open-Hole Completion
1942-07-08 Well Mode changed to Drilled and Cased
1942-07-09 Well Began Production
1942-07-09 Well Fluid changed to Crude Oil
1942-07-09 Well Mode changed to Flowing
1942-07-10 Perforation Treatment Performed - Acid Wash - No Pressure
1942-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1942-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-02 Well Fluid changed to Crude Oil
1976-02-02 Well Mode changed to Pumping
1983-11-15 Well Log Performed
1983-11-16 Well Log Performed
1983-12-17 Perforation Treatment Performed - Acid Wash - No Pressure
1984-03-31 Well Fluid changed to Crude Oil
1984-03-31 Well Mode changed to Suspended
1992-05-19 Well Type changed to Observation
1993-11-20 Well Fluid changed to Crude Oil
1993-11-20 Well Mode changed to Pumping
2004-07-12 Well Log Performed
2004-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-14 Perforation Treatment Performed - Cement Squeeze
2004-07-14 Plug Back Performed
2004-07-14 Well Fluid changed to Crude Oil
2004-07-14 Well Mode changed to Abandoned Zone
2011-11-30 Perforation Treatment Performed - Jet Perforation
2011-11-30 Well Log Performed
2011-12-01 Perforation Treatment Performed - Cement Plug
2011-12-01 Perforation Treatment Performed - Remedial Casing
2011-12-02 Perforation Treatment Performed - Cement Plug
2011-12-02 Perforation Treatment Performed - Jet Perforation
2011-12-02 Perforation Treatment Performed - Remedial Casing
2011-12-02 Well Log Performed
2011-12-03 Perforation Treatment Performed - Jet Perforation
2011-12-03 Well Log Performed
2011-12-04 Perforation Treatment Performed - Cement Plug
2011-12-04 Perforation Treatment Performed - Remedial Casing
2011-12-05 Perforation Treatment Performed - Cement Plug
2011-12-05 Perforation Treatment Performed - Jet Perforation
2011-12-05 Perforation Treatment Performed - Remedial Casing
2011-12-05 Well Log Performed
2011-12-06 Well Log Performed
2011-12-07 Perforation Treatment Performed - Jet Perforation
2011-12-08 Perforation Treatment Performed - Cement Plug
2011-12-08 Perforation Treatment Performed - Remedial Casing
2011-12-08 Plug Back Performed
2011-12-19 Well Abandoned
2011-12-19 Well Fluid changed to Crude Oil
2011-12-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1941-08-25 2043.70 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1942-07-08 Open Hole/Barefoot Completion 2043.70 2545.70 0
2011-12-01 Cement Plug 995.00 1020.00 0
2011-12-02 Perforation 602.00 603.00 21
2011-12-02 Remedial Casing Cementing 602.00 603.00 0
2011-12-02 Cement Plug 585.00 595.00 0
2011-12-03 Perforation 500.00 501.00 21
2011-12-04 Remedial Casing Cementing 500.00 501.00 0
2011-12-04 Cement Plug 488.00 498.00 0
2011-12-05 Perforation 395.00 396.00 21
2011-12-05 Remedial Casing Cementing 395.00 396.00 0
2011-12-05 Cement Plug 378.00 393.00 0
1942-07-10 Acid Wash 2508.50 2539.00 0
2011-12-07 Perforation 240.00 241.00 21
2011-12-08 Remedial Casing Cementing 240.00 241.00 0
2011-12-08 Cement Plug 223.00 238.00 0
1942-07-14 Acid Treatment 2215.90 2264.70 0
1942-07-16 Acid Treatment 2215.90 2539.00 0
1983-12-17 Acid Wash 2048.30 2185.40 0
2004-07-14 Cement Squeeze 2043.70 2545.70 0
2004-07-14 Packing Device Capped w/Cement 2014.30 2039.80 0
2011-11-30 Perforation 1025.00 1026.00 21
2011-12-01 Remedial Casing Cementing 1025.00 1026.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1971 48 0.0 0.0 0.0
1974 20 0.0 0.0 0.0
1975 5173 0.0 0.0 0.0
1976 5764 0.0 0.0 0.0
1977 331 0.0 0.0 0.0
1984 1913 0.0 0.0 0.0
1993 1008 0.0 0.0 0.0
1994 4738 0.0 0.0 0.0
1995 120 0.0 0.0 0.0
1997 3824 0.0 0.0 0.0
1998 5912 0.0 0.0 0.0
1999 8359 0.0 0.0 0.0
2000 144 0.0 0.0 0.0

For data sources see[6]

References