X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214251607000

Well Details

Well ID: 0214251607000
Loading map...
Location: 00/07-16-021-25W4/0
Location Alias: 00/07-16-21-25 W4M
Location Alias 2: 00/07-16-021-25 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 25
Section: 16
County/Municipality: Vulcan County
Well Name: HOUSTON HERRON 7-16-21-25
Operator Name: Houston Oil & Gas Ltd.
License Number: 0053160
License Date: 1975-03-04
License Status: Suspension
Spud Date: 1975-03-05
Final Drill Date: 1975-03-11
Well Total Depth: 887.00 m
Surface Hole Latitude: 50.782890
Surface Hole Longitude: -113.407052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-04 Obtained License
1975-03-06 Lost Circulation Occurred
1975-03-09 Drill Stem Test Performed
1975-03-11 Drill Stem Test Performed
1975-03-11 Finished Drilling
1975-03-13 Production Casing Operation Performed
1975-03-13 Well Mode changed to Drilled and Cased
1975-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-18 Perforation Treatment Performed - Fractured
1975-06-18 Perforation Treatment Performed - Jet Perforation
1975-07-05 Perforation Treatment Performed - Jet Perforation
1975-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-11 Perforation Treatment Performed - Cement Squeeze
1975-07-12 Perforation Treatment Performed - Cement Squeeze
1975-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-14 Perforation Treatment Performed - Fractured
1975-07-14 Perforation Treatment Performed - Jet Perforation
1975-11-13 Perforation Treatment Performed - Cement Squeeze
1975-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-17 Well Began Production
1976-11-17 Well Fluid changed to Gas
1976-11-17 Well Mode changed to Flowing
1996-10-01 Well Fluid changed to Gas
1996-10-01 Well Mode changed to Suspended
2003-12-15 Perforation Treatment Performed - Cement Squeeze
2003-12-15 Plug Back Performed
2003-12-15 Well Fluid changed to Gas
2003-12-15 Well Mode changed to Abandoned Zone
2003-12-19 Perforation Treatment Performed - Jet Perforation
2003-12-19 Well Log Performed
2004-04-09 Perforation Treatment Performed - Fractured
2005-07-19 Perforation Treatment Performed - Jet Perforation
2005-07-20 Well Log Performed
2005-07-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-06-18 Perforation 847.30 849.50 3
1975-07-12 Cement Squeeze 619.70 627.90 0
1975-07-14 Perforation 379.80 388.00 3
1975-07-14 Acid Treatment 379.80 388.00 0
1975-07-14 Fracture 379.80 388.00 0
1975-11-13 Cement Squeeze 379.80 388.00 0
1975-12-18 Acid Treatment 847.30 859.50 0
2003-12-15 Cement Squeeze 847.30 859.50 0
2003-12-19 Perforation 869.90 871.10 17
2004-04-09 Fracture 869.90 871.10 0
2005-07-19 Perforation 544.70 545.60 13
1975-06-18 Perforation 852.50 855.00 3
2005-07-19 Perforation 496.20 496.80 13
2005-07-19 Perforation 476.10 476.70 13
2005-07-19 Perforation 402.30 405.40 13
2005-07-19 Perforation 399.90 400.80 13
2005-07-19 Perforation 375.50 376.10 13
2005-07-19 Perforation 368.80 369.40 13
2005-07-19 Perforation 364.80 366.40 13
2005-07-19 Perforation 352.00 353.00 13
2005-07-19 Perforation 344.40 345.30 13
2005-07-19 Perforation 229.80 231.00 13
1975-06-18 Perforation 855.90 859.50 3
2005-07-23 Fracture 544.70 545.60 0
2005-07-23 Fracture 496.20 496.80 0
2005-07-23 Fracture 476.10 476.70 0
2005-07-23 Fracture 402.30 405.40 0
2005-07-23 Fracture 399.90 400.80 0
2005-07-23 Fracture 375.50 376.10 0
2005-07-23 Fracture 368.80 369.40 0
2005-07-23 Fracture 364.80 366.40 0
2005-07-23 Fracture 352.00 353.00 0
2005-07-23 Fracture 344.40 345.30 0
1975-06-18 Acid Treatment 847.30 859.50 0
2005-07-23 Fracture 229.80 231.00 0
1975-06-18 Fracture 847.30 859.50 0
1975-07-05 Perforation 619.70 627.90 3
1975-07-06 Acid Treatment 619.70 627.90 0
1975-07-06 Acid Treatment 619.70 627.90 0
1975-07-11 Cement Squeeze 619.70 627.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1212 0.0 0.0 0.0
1977 7816 0.0 0.0 0.0
1978 5902 0.0 0.0 0.0
1979 5761 0.0 0.0 0.0
1980 7033 0.0 0.0 0.0
1981 7441 0.0 0.0 0.0
1982 7413 0.0 0.0 0.0
1983 6767 0.0 0.0 0.0
1984 6775 0.0 0.0 0.0
1985 6936 0.0 0.0 0.0
1986 6720 0.0 0.0 0.0
1987 6116 0.0 0.0 0.0
1988 7115 0.0 0.0 0.0
1989 3070 0.0 0.0 0.0
1990 5653 0.0 0.0 0.0
1991 1809 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-03-06 Lost Circulation 68.30 68.30

For data sources see[6]

References