X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214233208002

Well Details

Well ID: 0214233208002
Loading map...
Location: 00/08-32-021-23W4/2
Location Alias: 00/08-32-21-23 W4M
Location Alias 2: 00/08-32-021-23 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 23
Section: 32
County/Municipality: Siksika 146
Well Name: ECA BLACKFT 8-32-21-23
Operator Name: Ovintiv Canada ULC
License Number: 0204247
License Date: 1997-07-31
License Status: Issued
Spud Date: 1997-08-03
Final Drill Date: 1997-08-09
Well Total Depth: 1588.00 m
Surface Hole Latitude: 50.822147
Surface Hole Longitude: -113.148167

For data sources see[1][2]

Well History

Date Event
1997-07-31 Obtained License
1997-08-04 Well Log Performed
1997-08-05 Surface Casing Operation Performed
1997-08-06 Direction Drilling Operation Performed - Deviate
1997-08-09 Finished Drilling
1997-08-09 Well Mode changed to Drilled and Cased
1997-08-10 Well Log Performed
1997-08-11 Production Casing Operation Performed
1997-08-11 Rig Released
1997-08-30 Perforation Treatment Performed - Jet Perforation
1997-09-01 Perforation Treatment Performed - Jet Perforation
1997-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-03 Perforation Treatment Performed - Jet Perforation
1997-09-03 Plug Back Performed
1997-09-05 Well Log Performed
2000-06-14 Well Log Performed
2000-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-21 Plug Back Performed
2000-07-28 Perforation Treatment Performed - Fractured
2000-07-28 Perforation Treatment Performed - Jet Perforation
2000-07-28 Well Log Performed
2000-07-28 Well Mode changed to Drilled and Cased
2001-07-03 Perforation Treatment Performed - Jet Perforation
2001-07-03 Well Log Performed
2001-07-05 Perforation Treatment Performed - Jet Perforation
2001-07-05 Well Log Performed
2001-07-10 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-08-06 865.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-30 Perforation 1541.00 1542.00 13
2001-07-03 Perforation 609.00 610.00 13
2001-07-03 Perforation 611.50 612.50 13
2001-07-05 Perforation 581.50 583.00 13
2001-07-05 Perforation 578.00 579.50 13
2001-07-10 Fracture 578.00 583.00 0
1997-08-30 Perforation 1542.50 1543.50 13
1997-09-01 Perforation 1538.00 1538.70 13
1997-09-03 Packing Device Capped w/Cement 1522.00 1530.00 0
1997-09-03 Perforation 1283.40 1284.40 13
2000-07-21 Packing Device Capped w/Cement 1523.40 1531.40 0
2000-07-21 Packing Device Capped w/Cement 1272.00 1280.00 0
2000-07-28 Perforation 873.00 877.00 13
2000-07-28 Fracture 873.00 877.00 0

For data sources see[5]



References