X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214232106000

Well Details

Well ID: 0214232106000
Loading map...
Location: 00/06-21-021-23W4/0
Location Alias: 00/06-21-21-23 W4M
Location Alias 2: 00/06-21-021-23 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 23
Section: 21
County/Municipality: Siksika 146
Well Name: ECA SHOLDICE 6-21-21-23
Operator Name: Ovintiv Canada ULC
License Number: 0161221
License Date: 1993-09-29
License Status: Issued
Spud Date: 1993-11-14
Final Drill Date: 1993-11-16
Well Total Depth: 926.00 m
Surface Hole Latitude: 50.797557
Surface Hole Longitude: -113.132777

For data sources see[1][2]

Well History

Date Event
1993-09-29 Obtained License
1993-11-14 Surface Casing Operation Performed
1993-11-16 Finished Drilling
1993-11-16 Production Casing Operation Performed
1993-11-16 Rig Released
1993-11-16 Well Mode changed to Drilled and Cased
1993-11-20 Well Log Performed
1993-11-26 Perforation Treatment Performed - Jet Perforation
1993-11-26 Well Log Performed
1993-11-27 Perforation Treatment Performed - Fractured
1993-12-20 Well Began Production
1993-12-20 Well Fluid changed to Gas
1993-12-20 Well Mode changed to Flowing
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Flowing
2001-03-08 Well Log Performed
2001-03-16 Perforation Treatment Performed - Jet Perforation
2001-03-16 Well Log Performed
2005-02-15 Perforation Treatment Performed - Jet Perforation
2005-02-15 Well Log Performed
2005-02-19 Perforation Treatment Performed - Jet Perforation
2005-02-19 Well Log Performed
2005-02-22 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-11-26 Perforation 896.50 904.00 13
2005-02-19 Perforation 211.00 213.50 13
2005-02-19 Perforation 218.00 220.00 13
2005-02-19 Perforation 221.00 222.00 13
2005-02-19 Perforation 234.00 236.00 13
2005-02-19 Perforation 238.00 238.50 13
2005-02-22 Fracture 433.50 434.50 0
2005-02-22 Fracture 419.50 420.00 0
2005-02-22 Fracture 415.00 415.50 0
2005-02-22 Fracture 412.00 413.50 0
2005-02-22 Fracture 321.00 322.00 0
1993-11-27 Fracture 896.50 904.00 0
2005-02-22 Fracture 238.00 238.50 0
2005-02-22 Fracture 234.00 236.00 0
2005-02-22 Fracture 221.00 222.00 0
2005-02-22 Fracture 211.00 213.50 0
2005-02-22 Fracture 208.00 209.00 0
2005-02-22 Fracture 218.00 220.00 0
2001-03-16 Perforation 633.00 634.00 13
2005-02-15 Perforation 321.00 322.00 13
2005-02-15 Perforation 412.00 413.50 13
2005-02-15 Perforation 415.00 415.50 13
2005-02-15 Perforation 419.50 420.00 13
2005-02-15 Perforation 433.50 434.50 13
2005-02-19 Perforation 208.00 209.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 88 0.0 0.0 0.0
1994 7530 0.0 0.0 0.0
1995 8517 0.0 0.0 0.0
1996 8709 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8471 0.0 0.0 0.0
2002 8729 0.0 0.0 0.0
2003 8610 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 1069 0.0 0.0 0.0
2006 2712 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 5856 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8560 0.0 0.0 0.0
2013 8241 0.0 0.0 0.0
2014 8440 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 8606 0.0 0.0 0.0
2017 8287 0.0 0.0 0.0
2018 8541 0.0 0.0 0.0
2019 8281 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[5]

References