X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214223216002

Well Details

Well ID: 0214223216002
Loading map...
Location: 00/16-32-021-22W4/2
Location Alias: 00/16-32-21-22 W4M
Location Alias 2: 00/16-32-021-22 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 22
Section: 32
County/Municipality: Siksika 146
Well Name: ECA SHOLDICE 16-32-21-22
Operator Name: Ovintiv Canada ULC
License Number: 0178245
License Date: 1995-05-31
License Status: Issued
Spud Date: 1995-06-10
Final Drill Date: 1995-06-16
Well Total Depth: 1545.00 m
Surface Hole Latitude: 50.831238
Surface Hole Longitude: -113.010299

For data sources see[1][2]

Well History

Date Event
1995-05-31 Obtained License
1995-06-10 Surface Casing Operation Performed
1995-06-10 Well Log Performed
1995-06-16 Finished Drilling
1995-06-16 Well Log Performed
1995-06-16 Well Mode changed to Drilled and Cased
1995-06-17 Drill Stem Test Performed
1995-06-18 Production Casing Operation Performed
1995-06-18 Rig Released
1995-06-27 Perforation Treatment Performed - Jet Perforation
1995-06-27 Well Log Performed
1995-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-11 Perforation Treatment Performed - Fractured
1995-07-13 Well Log Performed
2004-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-09 Plug Back Performed
2004-01-09 Well Log Performed
2004-01-14 Well Log Performed
2004-01-21 Perforation Treatment Performed - Fractured
2004-01-21 Perforation Treatment Performed - Jet Perforation
2004-01-21 Well Log Performed
2004-02-22 Perforation Treatment Performed - Jet Perforation
2004-02-22 Well Log Performed
2004-02-24 Well Log Performed
2004-03-01 Well Structure changed to Commingled
2011-11-26 Perforation Treatment Performed - Jet Perforation
2011-11-26 Well Log Performed
2011-12-02 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-27 Perforation 1232.50 1233.50 13
2011-11-26 Perforation 555.00 556.00 17
2011-11-26 Perforation 530.00 531.00 17
2011-11-26 Perforation 588.00 590.00 17
2011-11-26 Perforation 572.00 574.00 17
2011-11-26 Perforation 221.00 223.00 17
2011-11-26 Perforation 277.00 279.00 17
2011-11-26 Perforation 244.00 246.00 17
2011-12-02 Fracture 572.00 575.00 0
2011-12-02 Fracture 555.00 556.00 0
2011-12-02 Fracture 588.00 590.00 0
1995-06-27 Perforation 1239.00 1240.50 13
2011-12-02 Fracture 530.00 531.00 0
2011-12-02 Fracture 277.00 279.00 0
2011-12-02 Fracture 221.00 223.00 0
2011-12-02 Fracture 244.00 246.00 0
1995-06-30 Acid Treatment 1232.50 1233.50 0
1995-07-11 Fracture 1232.50 1240.50 0
2004-01-09 Packing Device Capped w/Cement 1219.00 1227.00 0
2004-01-21 Perforation 848.50 852.50 13
2004-01-21 Fracture 848.50 852.50 0
2004-02-22 Perforation 607.00 609.00 13
2004-02-22 Perforation 573.00 575.00 13

For data sources see[4]



References