X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214181106000

Well Details

Well ID: 0214181106000
Loading map...
Location: 00/06-11-021-18W4/0
Location Alias: 00/06-11-21-18 W4M
Location Alias 2: 00/06-11-021-18 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 18
Section: 11
County/Municipality: County of Newell
Well Name: CABRE ET AL BASSANO 6-11-21-18
Operator Name: Enerplus Corporation
License Number: 0105685
License Date: 1984-02-02
License Status: Abandoned
Spud Date: 1984-02-04
Final Drill Date: 1984-02-09
Well Total Depth: 1206.00 m
Surface Hole Latitude: 50.765840
Surface Hole Longitude: -112.397552

For data sources see[1][2]

Well History

Date Event
1984-02-02 Obtained License
1984-02-09 Finished Drilling
1984-02-09 Well Log Performed
1984-02-09 Well Mode changed to Drilled and Cased
1984-02-10 Drill Stem Test Performed
1984-02-11 Drill Stem Test Performed
1984-02-12 Production Casing Operation Performed
1984-03-05 Well Log Performed
1984-03-06 Perforation Treatment Performed - Jet Perforation
1984-03-11 Well Began Production
1984-03-11 Well Fluid changed to Crude Oil
1984-03-11 Well Mode changed to Pumping
1984-09-29 Perforation Treatment Performed - Fractured
1985-08-21 Well Fluid changed to Crude Oil
1985-08-21 Well Mode changed to Suspended
1995-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-25 Plug Back Performed
1995-10-25 Well Fluid changed to Crude Oil
1995-10-25 Well Log Performed
1995-10-25 Well Mode changed to Abandoned Zone
1995-10-26 Perforation Treatment Performed - Jet Perforation
1998-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-17 Plug Back Performed
1998-07-18 Perforation Treatment Performed - Jet Perforation
1998-07-18 Perforation Treatment Performed - Remedial Casing
1998-08-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-06 Perforation 1178.00 1180.00 13
1984-09-29 Fracture 1178.00 1180.00 0
1995-10-25 Packing Device Capped w/Cement 1167.00 1175.00 0
1995-10-26 Perforation 943.00 945.00 20
1998-07-17 Packing Device Capped w/Cement 924.50 932.50 0
1998-07-18 Perforation 284.00 285.00 13
1998-07-18 Remedial Casing Cementing 284.00 285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6844 0.0 0.0 0.0
1985 3123 0.0 0.0 0.0

For data sources see[5]

References