X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214151201002

Well Details

Well ID: 0214151201002
Loading map...
Location: 00/01-12-021-15W4/2
Location Alias: 00/01-12-21-15 W4M
Location Alias 2: 00/01-12-021-15 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 15
Section: 12
County/Municipality: County of Newell
Well Name: CARDINAL BANTRY 1-12-21-15
Operator Name: Cardinal Energy Ltd.
License Number: 0175911
License Date: 1995-02-08
License Status: Suspension
Spud Date: 1995-03-11
Final Drill Date: 1995-03-17
Well Total Depth: 1157.00 m
Surface Hole Latitude: 50.765117
Surface Hole Longitude: -111.945612

For data sources see[1][2]

Well History

Date Event
1995-02-08 Obtained License
1995-03-12 Surface Casing Operation Performed
1995-03-14 Direction Drilling Operation Performed - Deviate
1995-03-17 Finished Drilling
1995-03-17 Well Mode changed to Drilled and Cased
1995-03-18 Drill Stem Test Performed
1995-03-18 Well Log Performed
1995-03-20 Production Casing Operation Performed
1995-03-20 Rig Released
1995-06-04 Well Log Performed
1995-06-06 Well Log Performed
1995-06-10 Well Log Performed
1995-06-28 Well Log Performed
1995-06-29 Perforation Treatment Performed - Jet Perforation
1995-06-30 Perforation Treatment Performed - Jet Perforation
1995-06-30 Well Log Performed
2004-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-10 Perforation Treatment Performed - Cement Squeeze
2004-01-10 Plug Back Performed
2004-01-14 Perforation Treatment Performed - Jet Perforation
2004-01-14 Well Log Performed
2004-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-04 Well Began Production
2004-02-04 Well Fluid changed to Water
2004-02-04 Well Type changed to Source
2006-09-12 Well Fluid changed to Water
2006-09-12 Well Mode changed to Suspended
2006-09-12 Well Type changed to Source
2012-07-13 Perforation Treatment Performed - Jet Perforation
2012-07-18 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-03-14 635.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-29 Perforation 1116.00 1117.00 20
1995-06-30 Perforation 1108.00 1113.00 20
2004-01-10 Acid Treatment 1108.00 1117.00 0
2004-01-10 Cement Squeeze 1108.00 1117.00 0
2004-01-14 Perforation 1135.00 1139.50 17
2004-01-14 Perforation 1131.00 1135.00 17
2004-01-23 Acid Treatment 1131.00 1139.50 0
2012-07-13 Perforation 1108.00 1113.00 17
2012-07-18 Fracture 1108.00 1113.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5307 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References