X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214121709002

Well Details

Well ID: 0214121709002
Loading map...
Location: 00/09-17-021-12W4/2
Location Alias: 00/09-17-21-12 W4M
Location Alias 2: 00/09-17-021-12 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 12
Section: 17
County/Municipality: County of Newell
Well Name: ABERCAN ET AL PRINCESS 9-17-21-12
Operator Name: TAQA North Ltd.
License Number: 0067488
License Date: 1977-12-16
License Status: Issued
Spud Date: 1978-08-03
Final Drill Date: 1978-08-09
Well Total Depth: 954.00 m
Surface Hole Latitude: 50.786494
Surface Hole Longitude: -111.621573

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-16 Obtained License
1978-08-08 Kick Occurred
1978-08-09 Finished Drilling
1978-08-09 Well Mode changed to Drilled and Cased
1978-08-10 Drill Stem Test Performed
1978-08-12 Production Casing Operation Performed
1978-10-03 Perforation Treatment Performed - Jet Perforation
1990-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-10 Plug Back Performed
1990-08-20 Perforation Treatment Performed - Jet Perforation
1990-08-21 Perforation Treatment Performed - Fractured
1990-09-04 Perforation Treatment Performed - Jet Perforation
1990-09-04 Perforation Treatment Performed - Remedial Casing
1990-11-05 Well Began Production
1990-11-05 Well Fluid changed to Gas
1990-11-05 Well Mode changed to Flowing
2006-07-08 Well Log Performed
2006-07-11 Perforation Treatment Performed - Jet Perforation
2006-07-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-03 Perforation 935.80 937.50 13
1990-08-10 Packing Device Capped w/Cement 922.00 930.00 0
1990-08-20 Perforation 603.00 607.00 7
1990-08-21 Fracture 603.00 607.00 0
1990-09-04 Perforation 280.00 280.30 7
1990-09-04 Remedial Casing Cementing 280.00 280.30 0
2006-07-11 Perforation 409.00 412.00 13
2006-07-11 Perforation 398.00 401.00 13
2006-07-12 Fracture 398.00 412.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1247 0.0 0.0 0.0
1991 7368 0.0 0.0 0.0
1992 8379 0.0 0.0 0.0
1993 8496 0.0 0.0 0.0
1994 8581 0.0 0.0 0.0
1995 8654 0.0 0.0 0.0
1996 8777 0.0 0.0 0.0
1997 8756 0.0 0.0 0.0
1998 8745 0.0 0.0 0.0
1999 8731 0.0 0.0 0.0
2000 8691 0.0 0.0 0.0
2001 8493 0.0 0.0 0.0
2002 8560 0.0 0.0 0.0
2003 8639 0.0 0.0 0.0
2004 8665 0.0 0.0 0.0
2005 8757 0.0 0.0 0.0
2006 8737 0.0 0.0 0.0
2007 8745 0.0 0.0 0.0
2008 8730 0.0 0.0 0.0
2009 8604 0.0 0.0 0.0
2010 8552 0.0 0.0 0.0
2011 8611 0.0 0.0 0.0
2012 8773 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8681 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8698 0.0 0.0 0.0
2017 8424 0.0 0.0 0.0
2018 8459 0.0 0.0 0.0
2019 8644 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-08-08 Kick 288.00 288.00

For data sources see[6]

References