X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214120515000

Well Details

Well ID: 0214120515000
Loading map...
Location: 00/15-05-021-12W4/0
Location Alias: 00/15-05-21-12 W4M
Location Alias 2: 00/15-05-021-12 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 12
Section: 05
County/Municipality: County of Newell
Well Name: ABERCAN PRINCESS 15-5-21-12
Operator Name: TAQA North Ltd.
License Number: 0218626
License Date: 1998-11-12
License Status: Suspension
Spud Date: 1998-11-24
Final Drill Date: 1998-11-30
Well Total Depth: 1290.00 m
Surface Hole Latitude: 50.760891
Surface Hole Longitude: -111.626165

For data sources see[1][2]

Well History

Date Event
1998-11-12 Obtained License
1998-11-25 Surface Casing Operation Performed
1998-11-26 Direction Drilling Operation Performed - Deviate
1998-11-30 Finished Drilling
1998-11-30 Well Log Performed
1998-12-01 Drill Stem Test Performed
1998-12-03 Drill Stem Test Performed
1998-12-05 Production Casing Operation Performed
1998-12-05 Rig Released
1998-12-05 Well Mode changed to Drilled and Cased
1998-12-19 Perforation Treatment Performed - Jet Perforation
1998-12-19 Well Log Performed
1998-12-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-22 Plug Back Performed
1998-12-22 Well Log Performed
1998-12-28 Perforation Treatment Performed - Jet Perforation
1998-12-28 Well Log Performed
1998-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-06 Well Log Performed
1999-01-12 Well Log Performed
1999-01-29 Perforation Treatment Performed - Cement Squeeze
1999-02-03 Perforation Treatment Performed - Jet Perforation
1999-02-03 Well Log Performed
1999-02-04 Well Log Performed
1999-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-02 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-11-26 746.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-19 Perforation 1253.00 1256.00 10
1998-12-19 Perforation 1259.00 1263.50 10
1998-12-22 Packing Device Capped w/Cement 1234.00 1242.00 0
1998-12-28 Perforation 972.00 977.00 10
1998-12-29 Acid Treatment 972.00 977.00 0
1999-01-29 Cement Squeeze 972.00 977.00 0
1999-02-03 Perforation 981.00 989.00 7
1999-02-05 Acid Treatment 985.00 989.00 0

For data sources see[5]



References