X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214120305002

Well Details

Well ID: 0214120305002
Loading map...
Location: 00/05-03-021-12W4/2
Location Alias: 00/05-03-21-12 W4M
Location Alias 2: 00/05-03-021-12 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 12
Section: 03
County/Municipality: County of Newell
Well Name: ABERCAN ET AL PRINCESS 5-3-21-12
Operator Name: TAQA North Ltd.
License Number: 0061077
License Date: 1976-11-10
License Status: Issued
Spud Date: 1977-01-28
Final Drill Date: 1977-02-01
Well Total Depth: 997.60 m
Surface Hole Latitude: 50.751214
Surface Hole Longitude: -111.596312

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-10 Obtained License
1977-02-01 Finished Drilling
1977-02-01 Well Mode changed to Drilled and Cased
1977-02-03 Drill Stem Test Performed
1977-02-04 Production Casing Operation Performed
1977-05-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1977-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1977-11-21 Well Mode changed to Abandoned Zone
1977-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-22 Perforation Treatment Performed - Jet Perforation
1977-11-23 Perforation Treatment Performed - Fractured
1977-11-23 Perforation Treatment Performed - Jet Perforation
1977-11-24 Perforation Treatment Performed - Fractured
1977-11-24 Perforation Treatment Performed - Jet Perforation
1983-09-25 Well Log Performed
1983-09-26 Well Log Performed
1983-09-28 Perforation Treatment Performed - Cement Squeeze
1983-09-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-05-12 Hydra Jet Perforation 831.80 831.80 0
1977-11-23 Fracture 433.40 446.80 3
1977-11-24 Perforation 309.70 309.70 3
1977-11-24 Perforation 356.00 357.20 3
1977-11-24 Perforation 367.60 368.80 3
1977-11-24 Perforation 376.10 379.80 3
1977-11-24 Fracture 309.70 379.80 0
1983-09-28 Perforation 193.60 193.90 13
1983-09-28 Cement Squeeze 193.60 193.90 0
1977-09-29 Packing Device Capped w/Cement 823.00 823.00 0
1977-09-30 Hydra Jet Perforation 798.90 799.20 0
1977-11-22 Packing Device Capped w/Cement 762.00 762.00 7
1977-11-22 Perforation 632.20 635.20 7
1977-11-22 Perforation 636.40 639.20 7
1977-11-22 Perforation 632.20 639.20 7
1977-11-23 Perforation 433.40 435.90 7
1977-11-23 Perforation 444.40 446.80 7

For data sources see[4]



References