If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0214093508B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.824362,"lon":-111.134561,"icon":""}]} |
Location: B0/08-35-021-09W4/0 | |
Location Alias: B0/08-35-21-09 W4M | |
Location Alias 2: B0/08-35-021-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 4 | |
Range: 09 | |
Section: 35 | |
County/Municipality: Special Areas No. 2 | |
Well Name: RESPONSE 8BHZ JENNER 8-35-21-9 | |
Operator Name: Hemisphere Energy Corporation | |
License Number: 0192309 | |
License Date: 1996-10-15 | |
License Status: RecCertified | |
Spud Date: 1996-10-16 | |
Final Drill Date: 1996-10-20 | |
Well Total Depth: 1140.00 m | |
Surface Hole Latitude: 50.824362 | |
Surface Hole Longitude: -111.134561 |
Date | Event |
---|---|
1996-10-15 | Obtained License |
1996-10-17 | Surface Casing Operation Performed |
1996-10-19 | Direction Drilling Operation Performed - Deviate |
1996-10-20 | Finished Drilling |
1996-10-20 | Well Mode changed to Drilled and Cased |
1996-10-21 | Well Log Performed |
1996-10-22 | Production Casing Operation Performed |
1996-10-22 | Rig Released |
1996-10-24 | Well Log Performed |
1996-10-29 | Perforation Treatment Performed - Jet Perforation |
1996-10-29 | Well Log Performed |
1996-10-31 | Perforation Treatment Performed - Jet Perforation |
1996-10-31 | Well Log Performed |
1996-11-01 | Perforation Treatment Performed - Jet Perforation |
1996-11-01 | Well Log Performed |
1998-12-06 | Well Began Production |
1998-12-06 | Well Fluid changed to Gas |
1998-12-06 | Well Mode changed to Flowing |
1999-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-12-09 | Perforation Treatment Performed - Jet Perforation |
1999-12-09 | Plug Back Performed |
1999-12-09 | Well Fluid changed to Gas |
1999-12-09 | Well Mode changed to Abandoned Zone |
1999-12-10 | Perforation Treatment Performed - Jet Perforation |
2005-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-06-22 | Plug Back Performed |
2005-06-23 | Perforation Treatment Performed - Jet Perforation |
2005-06-24 | Perforation Treatment Performed - Remedial Casing |
2005-10-11 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2005-10-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-11 | Perforation Treatment Performed - Remedial Casing |
2005-10-13 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-10-19 | 720.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-10-29 | Perforation | 1085.00 | 1087.00 | 13 |
2005-10-11 | Hydra Jet Perforation | 234.00 | 234.50 | 4 |
2005-10-11 | Remedial Casing Cementing | 234.00 | 234.50 | 0 |
2005-10-11 | Packing Device Capped w/Cement | 221.70 | 230.00 | 0 |
1996-10-31 | Perforation | 1073.00 | 1074.00 | 13 |
1996-11-01 | Perforation | 1063.00 | 1064.00 | 13 |
1999-12-09 | Packing Device Capped w/Cement | 1056.00 | 1062.00 | 0 |
1999-12-09 | Perforation | 763.00 | 764.00 | 13 |
1999-12-10 | Perforation | 751.00 | 752.00 | 13 |
2005-06-22 | Packing Device Capped w/Cement | 733.00 | 742.00 | 0 |
2005-06-23 | Perforation | 713.00 | 714.00 | 14 |
2005-06-24 | Remedial Casing Cementing | 713.00 | 714.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 24 | 0.0 | 0.0 | 0.0 |
1999 | 7524 | 0.0 | 0.0 | 0.0 |
For data sources see[6]