X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214061412000

Well Details

Well ID: 0214061412000
Loading map...
Location: 00/12-14-021-06W4/0
Location Alias: 00/12-14-21-06 W4M
Location Alias 2: 00/12-14-021-06 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 14
County/Municipality: Special Areas No. 2
Well Name: HEMISPHERE ATL-BUFF 12-14-21-6
Operator Name: Hemisphere Energy Corporation
License Number: 0073820
License Date: 1979-01-09
License Status: Abandoned
Spud Date: 1979-01-17
Final Drill Date: 1979-01-22
Well Total Depth: 970.00 m
Surface Hole Latitude: 50.786891
Surface Hole Longitude: -110.741523

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-09 Obtained License
1979-01-22 Finished Drilling
1979-01-22 Well Mode changed to Drilled and Cased
1979-01-23 Production Casing Operation Performed
1979-01-29 Perforation Treatment Performed - Jet Perforation
1979-01-30 Perforation Treatment Performed - Cement Squeeze
1979-01-30 Perforation Treatment Performed - Jet Perforation
1979-02-01 Well Began Production
1979-02-01 Well Fluid changed to Crude Oil
1979-02-01 Well Mode changed to Flowing
1983-06-23 Well Fluid changed to Crude Oil
1983-06-23 Well Mode changed to Pumping
1984-04-30 Perforation Treatment Performed - Cement Squeeze
1984-04-30 Perforation Treatment Performed - Jet Perforation
1984-06-30 Well Fluid changed to Crude Oil
1984-06-30 Well Mode changed to Suspended
2000-09-21 Perforation Treatment Performed - Cement Squeeze
2000-09-21 Plug Back Performed
2000-09-21 Well Fluid changed to Crude Oil
2000-09-21 Well Mode changed to Abandoned Zone
2000-09-22 Well Fluid changed to Crude Oil
2000-09-22 Well Mode changed to Abandoned and Whipstocked
2001-03-22 Well Log Performed
2004-11-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-29 Perforation 939.50 940.10 7
1979-01-30 Perforation 926.00 930.10 7
1979-01-30 Perforation 930.10 930.50 7
1979-01-30 Cement Squeeze 939.50 940.10 0
1984-04-30 Cement Squeeze 926.00 930.50 0
1984-04-30 Perforation 926.00 929.50 0
2000-09-21 Cement Squeeze 926.50 929.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 3924 0.0 0.0 0.0
1980 1224 0.0 0.0 0.0
1983 4536 0.0 0.0 0.0
1984 2098 0.0 0.0 0.0

For data sources see[5]

References