X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214061410000

Well Details

Well ID: 0214061410000
Loading map...
Location: 00/10-14-021-06W4/0
Location Alias: 00/10-14-21-06 W4M
Location Alias 2: 00/10-14-021-06 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 14
County/Municipality: Special Areas No. 2
Well Name: HEMISPHERE ATL-BUFF 10-14-21-6
Operator Name: Hemisphere Energy Corporation
License Number: 0070560
License Date: 1978-07-07
License Status: Abandoned
Spud Date: 1978-07-19
Final Drill Date: 1978-07-29
Well Total Depth: 979.00 m
Surface Hole Latitude: 50.786574
Surface Hole Longitude: -110.730651

For data sources see[1][2]

Well History

Date Event
1978-07-07 Obtained License
1978-07-26 Drill Stem Test Performed
1978-07-27 Drill Stem Test Performed
1978-07-29 Finished Drilling
1978-07-29 Well Log Performed
1978-07-29 Well Mode changed to Drilled and Cased
1978-07-30 Production Casing Operation Performed
1978-07-30 Rig Released
1978-08-02 Well Log Performed
1978-08-03 Perforation Treatment Performed - Jet Perforation
1978-08-16 Well Began Production
1978-08-16 Well Fluid changed to Crude Oil
1978-08-16 Well Mode changed to Pumping
1994-02-01 Well Fluid changed to Crude Oil
1994-02-01 Well Mode changed to Suspended
1999-11-23 Well Fluid changed to Crude Oil
1999-11-23 Well Mode changed to Pumping
2003-10-04 Well Fluid changed to Crude Oil
2003-10-04 Well Mode changed to Suspended
2004-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-30 Plug Back Performed
2004-09-30 Well Fluid changed to Crude Oil
2004-09-30 Well Mode changed to Abandoned Zone
2004-10-02 Well Abandoned
2004-10-02 Well Fluid changed to Crude Oil
2004-10-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-03 Perforation 916.20 918.70 7
2004-09-30 Packing Device Capped w/Cement 901.00 909.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2501 0.0 0.0 0.0
1979 4107 0.0 0.0 0.0
1980 5979 0.0 0.0 0.0
1981 6018 0.0 0.0 0.0
1982 451 0.0 0.0 0.0
1983 8469 0.0 0.0 0.0
1984 8639 0.0 0.0 0.0
1985 8664 0.0 0.0 0.0
1986 8688 0.0 0.0 0.0
1987 8441 0.0 0.0 0.0
1988 8527 0.0 0.0 0.0
1989 8729 0.0 0.0 0.0
1990 8464 0.0 0.0 0.0
1991 8101 0.0 0.0 0.0
1992 8767 0.0 0.0 0.0
1993 8508 0.0 0.0 0.0
1994 216 0.0 0.0 0.0
1999 909 0.0 0.0 0.0
2000 8508 0.0 0.0 0.0
2001 8514 0.0 0.0 0.0
2002 8495 0.0 0.0 0.0
2003 2994 0.0 0.0 0.0

For data sources see[5]

References