X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214061304004

Well Details

Well ID: 0214061304004
Loading map...
Location: 00/04-13-021-06W4/4
Location Alias: 00/04-13-21-06 W4M
Location Alias 2: 00/04-13-021-06 W4/04
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 13
County/Municipality: Special Areas No. 2
Well Name: HEMISPHERE ATL-BUFF 4-13-21-6
Operator Name: Hemisphere Energy Corporation
License Number: 0070453
License Date: 1978-06-30
License Status: Suspension
Spud Date: 1978-07-03
Final Drill Date: 1978-07-07
Well Total Depth: 990.60 m
Surface Hole Latitude: 50.778609
Surface Hole Longitude: -110.718635

For data sources see[1][2]

Well History

Date Event
1978-06-30 Obtained License
1978-07-07 Finished Drilling
1978-07-07 Well Log Performed
1978-07-07 Well Mode changed to Drilled and Cased
1978-07-08 Blow Occurred
1978-07-08 Production Casing Operation Performed
1978-07-08 Rig Released
1978-07-26 Well Log Performed
1978-07-27 Perforation Treatment Performed - Jet Perforation
1979-08-13 Well Log Performed
1979-08-14 Perforation Treatment Performed - Cement Squeeze
1979-08-18 Perforation Treatment Performed - Jet Perforation
1979-08-18 Well Log Performed
1986-03-03 Perforation Treatment Performed - Fractured
1997-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-14 Plug Back Performed
1997-03-15 Perforation Treatment Performed - Jet Perforation
1997-03-15 Well Log Performed
2005-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-15 Plug Back Performed
2005-09-16 Perforation Treatment Performed - Jet Perforation
2005-09-16 Well Log Performed
2005-09-22 Well Began Production
2005-09-22 Well Fluid changed to Gas
2005-09-22 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-27 Perforation 932.10 934.50 7
1979-08-14 Cement Squeeze 932.10 934.50 0
1979-08-18 Perforation 922.60 927.70 7
1986-03-03 Fracture 922.60 927.70 0
1997-03-14 Packing Device Capped w/Cement 905.00 913.20 0
1997-03-15 Perforation 853.40 858.90 13
2005-09-15 Packing Device Capped w/Cement 839.50 847.50 0
2005-09-16 Perforation 749.00 750.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2472 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8607 0.0 0.0 0.0
2009 8742 0.0 0.0 0.0
2010 8036 0.0 0.0 0.0
2011 8279 0.0 0.0 0.0
2012 8591 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 1199 0.0 0.0 0.0
2015 893 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-08 Blow 990.60 990.60

For data sources see[6]

References