X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214051913000

Well Details

Well ID: 0214051913000
Loading map...
Location: 00/13-19-021-05W4/0
Location Alias: 00/13-19-21-05 W4M
Location Alias 2: 00/13-19-021-05 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 05
Section: 19
County/Municipality: Special Areas No. 2
Well Name: HEMISPHERE 5B-19 ATL-BUFF 13-19-21-5
Operator Name: Hemisphere Energy Corporation
License Number: 0490066
License Date: 2018-07-19
License Status: Issued
Spud Date: 2018-08-02
Final Drill Date: 2018-08-07
Well Total Depth: 1746.00 m
Surface Hole Latitude: 50.796985
Surface Hole Longitude: -110.693863

For data sources see[1][2]

Well History

Date Event
2018-07-19 Obtained License
2018-08-03 Surface Casing Operation Performed
2018-08-04 Direction Drilling Operation Performed - Deviate
2018-08-05 Direction Drilling Operation Performed - Horizontal
2018-08-06 Intermediate Casing Operation Performed
2018-08-07 Finished Drilling
2018-08-07 Well Log Performed
2018-08-07 Well Mode changed to Drilled and Cased
2018-08-08 Liner Casing Operation Performed
2018-08-08 Perforation Treatment Performed - Slotted Liner or Casing
2018-08-08 Rig Released
2018-08-08 Well Log Performed
2018-08-15 Perforation Treatment Performed - Slotted Liner or Casing
2018-08-23 Well Began Production
2018-08-23 Well Fluid changed to Crude Oil
2018-08-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-02 Savanna Drilling Corp. 440 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-04 578.90 Deviate (5 - 79 degrees)
2018-08-05 1067.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-08 Slotted Liner 1101.00 1745.30 0
2018-08-15 Slotted Liner 1112.90 1746.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2928 0.0 0.0 0.0
2019 8422 0.0 0.0 0.0
2020 2118 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-08 No Incident Encountered 0.00 0.00
2018-08-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References