X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214031306020

Well Details

Well ID: 0214031306020
Loading map...
Location: 02/06-13-021-03W4/0
Location Alias: 02/06-13-21-03 W4M
Location Alias 2: 02/06-13-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 13
County/Municipality: Special Areas No. 2
Well Name: CDN-SUP ATLEE A6-13-21-3
Operator Name: ExxonMobil Canada Resources Company
License Number: 0056914
License Date: 1976-02-03
License Status: RecCertified
Spud Date: 1976-02-10
Final Drill Date: 1976-02-12
Well Total Depth: 482.20 m
Surface Hole Latitude: 50.782200
Surface Hole Longitude: -110.293622

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-03 Obtained License
1976-02-12 Finished Drilling
1976-02-12 Production Casing Operation Performed
1976-02-20 Perforation Treatment Performed - Jet Perforation
1976-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-22 Perforation Treatment Performed - Fractured
1976-03-22 Well Mode changed to Drilled and Cased
1976-07-22 Well Began Production
1976-07-22 Well Fluid changed to Gas
1976-07-22 Well Mode changed to Flowing
1993-08-14 Perforation Treatment Performed - Cement Plug
1993-08-14 Plug Back Performed
1993-08-14 Well Fluid changed to Gas
1993-08-14 Well Mode changed to Abandoned
1993-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-20 Perforation 457.80 460.20 10
1976-02-22 Fracture 457.80 460.20 0
1976-02-22 Fracture 365.20 395.00 0
1993-08-14 Cement Plug 0.10 452.00 0
1976-02-20 Perforation 365.20 367.60 3
1976-02-20 Perforation 369.40 370.00 3
1976-02-20 Perforation 374.30 375.50 3
1976-02-20 Perforation 376.70 377.30 3
1976-02-20 Perforation 381.00 382.20 3
1976-02-20 Perforation 391.40 392.60 3
1976-02-20 Perforation 393.80 395.00 3
1976-02-22 Acid Treatment 457.80 460.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3646 0.0 0.0 0.0
1977 8732 0.0 0.0 0.0
1978 5930 0.0 0.0 0.0
1979 7968 0.0 0.0 0.0
1980 8730 0.0 0.0 0.0
1981 8713 0.0 0.0 0.0
1982 8212 0.0 0.0 0.0
1983 8735 0.0 0.0 0.0
1984 8731 0.0 0.0 0.0
1985 3190 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8748 0.0 0.0 0.0
1988 7941 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8081 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 5831 0.0 0.0 0.0

For data sources see[5]

References