X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214030406000

Well Details

Well ID: 0214030406000
Loading map...
Location: 00/06-04-021-03W4/0
Location Alias: 00/06-04-21-03 W4M
Location Alias 2: 00/06-04-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 04
County/Municipality: Special Areas No. 2
Well Name: HIGHFIELD ET AL ATLEE 6-4-21-3
Operator Name: Devon Canada Corporation
License Number: 0066313
License Date: 1977-10-24
License Status: Re-Entered
Spud Date: 1977-10-25
Final Drill Date: 1977-10-26
Well Total Depth: 466.30 m
Surface Hole Latitude: 50.750650
Surface Hole Longitude: -110.368009

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-24 Obtained License
1977-10-26 Finished Drilling
1977-10-26 Production Casing Operation Performed
1977-10-26 Well Mode changed to Drilled and Cased
1977-11-03 Perforation Treatment Performed - Jet Perforation
1977-11-07 Perforation Treatment Performed - Fractured
1977-11-11 Well Log Performed
1977-11-14 Perforation Treatment Performed - Selective Jet Perforations
1977-12-21 Perforation Treatment Performed - Fractured
1978-01-02 Well Began Production
1978-01-02 Well Fluid changed to Gas
1978-01-02 Well Mode changed to Flowing
1995-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-05 Plug Back Performed
1995-10-05 Well Fluid changed to Gas
1995-10-05 Well Mode changed to Abandoned
1995-10-06 Well Fluid changed to Gas
1995-10-06 Well Mode changed to Abandoned and Re-entered
1995-10-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-03 Perforation 431.60 432.50 7
1977-11-14 Selective Jet Perforations 384.40 386.80 0
1977-11-14 Selective Jet Perforations 389.20 399.00 0
1977-12-21 Fracture 350.50 399.00 0
1995-10-05 Packing Device Capped w/Cement 322.00 330.00 0
1977-11-03 Perforation 442.90 445.20 7
1977-11-07 Fracture 431.60 445.20 0
1977-11-14 Selective Jet Perforations 350.50 355.70 0
1977-11-14 Selective Jet Perforations 360.60 365.80 0
1977-11-14 Selective Jet Perforations 369.70 377.30 0
1977-11-14 Selective Jet Perforations 378.00 378.60 0
1977-11-14 Selective Jet Perforations 379.50 380.10 0
1977-11-14 Selective Jet Perforations 381.30 383.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 7103 0.0 0.0 0.0
1979 7038 0.0 0.0 0.0
1980 8369 0.0 0.0 0.0
1981 8712 0.0 0.0 0.0
1982 6929 0.0 0.0 0.0
1983 3812 0.0 0.0 0.0
1984 6970 0.0 0.0 0.0
1985 6480 0.0 0.0 0.0
1986 8724 0.0 0.0 0.0
1987 8725 0.0 0.0 0.0
1988 8746 0.0 0.0 0.0
1989 8714 0.0 0.0 0.0
1990 8040 0.0 0.0 0.0
1991 8525 0.0 0.0 0.0
1992 8632 0.0 0.0 0.0
1993 8733 0.0 0.0 0.0
1994 8705 0.0 0.0 0.0
1995 6508 0.0 0.0 0.0

For data sources see[5]

References