X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205032704000

Well Details

Well ID: 0205032704000
Loading map...
Location: 00/04-27-020-03W5/0
Location Alias: 00/04-27-20-03 W5M
Location Alias 2: 00/04-27-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 27
County/Municipality: Foothills County
Well Name: CNRL TV 4-27-20-3
Operator Name: Canadian Natural Resources Limited
License Number: B0000112
License Date: 1940-05-23
License Status: Abandoned
Spud Date: 1940-06-17
Final Drill Date: 1940-12-13
Well Total Depth: 2617.60 m
Surface Hole Latitude: 50.719528
Surface Hole Longitude: -114.345076

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-05-23 Obtained License
1940-11-22 Liner Casing Operation Performed
1940-12-13 Finished Drilling
1940-12-13 Perforation Treatment Performed - Open-Hole Completion
1940-12-13 Well Mode changed to Drilled and Cased
1940-12-14 Perforation Treatment Performed - Acid Wash - No Pressure
1940-12-14 Well Began Production
1940-12-14 Well Fluid changed to Crude Oil
1940-12-14 Well Mode changed to Flowing
1940-12-16 Perforation Treatment Performed - Acid Wash - No Pressure
1940-12-17 Perforation Treatment Performed - Acid Wash - No Pressure
1940-12-21 Perforation Treatment Performed - Bullet Perforation
1940-12-22 Perforation Treatment Performed - Acid Wash - No Pressure
1963-05-31 Well Fluid changed to Crude Oil
1963-05-31 Well Mode changed to Gas Lift
1966-10-21 Well Began Injection
1966-10-21 Well Fluid changed to Water
1966-10-21 Well Type changed to Injection
1994-10-31 Well Fluid changed to Water
1994-10-31 Well Mode changed to Suspended
1994-10-31 Well Type changed to Injection
2006-07-09 Well Log Performed
2006-07-10 Well Log Performed
2006-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-14 Perforation Treatment Performed - Cement Squeeze
2006-07-14 Plug Back Performed
2006-07-14 Well Fluid changed to Water
2006-07-14 Well Mode changed to Abandoned Zone
2006-07-14 Well Type changed to Injection
2006-07-17 Perforation Treatment Performed - Jet Perforation
2006-07-18 Perforation Treatment Performed - Remedial Casing
2006-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-24 Perforation Treatment Performed - Jet Perforation
2006-07-24 Well Log Performed
2006-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-25 Perforation Treatment Performed - Remedial Casing
2006-07-26 Perforation Treatment Performed - Jet Perforation
2006-07-26 Well Log Performed
2006-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-27 Perforation Treatment Performed - Remedial Casing
2006-07-29 Perforation Treatment Performed - Cement Plug
2006-07-29 Perforation Treatment Performed - Jet Perforation
2006-07-29 Perforation Treatment Performed - Remedial Casing
2006-07-29 Well Log Performed
2006-07-30 Perforation Treatment Performed - Cement Plug
2006-07-30 Perforation Treatment Performed - Jet Perforation
2006-07-30 Perforation Treatment Performed - Remedial Casing
2006-07-30 Well Log Performed
2006-07-31 Perforation Treatment Performed - Cement Plug
2006-08-31 Well Abandoned
2006-08-31 Well Fluid changed to Water
2006-08-31 Well Mode changed to Abandoned
2006-08-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-12-13 Open Hole/Barefoot Completion 2546.30 2617.60 0
2006-07-17 Perforation 2135.00 2136.00 17
2006-07-18 Remedial Casing Cementing 2135.00 2136.00 0
2006-07-22 Packing Device Capped w/Cement 1164.00 2133.00 0
2006-07-24 Perforation 988.00 989.00 13
2006-07-25 Remedial Casing Cementing 988.00 989.00 0
2006-07-25 Packing Device Capped w/Cement 710.00 983.00 0
2006-07-26 Perforation 600.00 601.00 17
2006-07-27 Remedial Casing Cementing 600.00 601.00 0
2006-07-27 Packing Device Capped w/Cement 425.00 595.00 0
2006-07-29 Perforation 199.00 200.00 17
1940-12-14 Acid Wash 2563.40 2617.60 0
2006-07-29 Remedial Casing Cementing 199.00 200.00 0
2006-07-29 Cement Plug 184.00 200.00 0
2006-07-30 Perforation 175.40 176.40 17
2006-07-30 Remedial Casing Cementing 175.40 176.40 0
2006-07-30 Cement Plug 42.00 176.40 0
2006-07-31 Cement Plug 3.00 42.00 0
1940-12-16 Acid Wash 2563.40 2617.60 0
1940-12-17 Acid Wash 2563.40 2617.60 0
1940-12-21 Bullet Perforation 2496.30 2503.90 10
1940-12-21 Bullet Perforation 2471.90 2487.20 7
1940-12-22 Acid Wash 2471.90 2503.90 0
2006-07-14 Cement Squeeze 2471.90 2617.60 0
2006-07-14 Packing Device Capped w/Cement 2327.70 2398.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References