X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205032209002

Well Details

Well ID: 0205032209002
Loading map...
Location: 00/09-22-020-03W5/2
Location Alias: 00/09-22-20-03 W5M
Location Alias 2: 00/09-22-020-03 W5/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 22
County/Municipality: Foothills County
Well Name: HOME ROYALITE 73 TV 9-22-20-3
Operator Name: Devon Canada Corporation
License Number: B0000432
License Date: 1943-06-12
License Status: RecCertified
Spud Date: 1943-09-10
Final Drill Date: 1948-08-28
Well Total Depth: 2565.80 m
Surface Hole Latitude: 50.712096
Surface Hole Longitude: -114.328007

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1943-06-12 Obtained License
1944-01-02 Perforation Treatment Performed - Open-Hole Completion
1944-01-03 Perforation Treatment Performed - Acid Wash - No Pressure
1944-01-04 Perforation Treatment Performed - Acid Wash - No Pressure
1944-01-06 Perforation Treatment Performed - Acid Wash - No Pressure
1944-02-01 Perforation Treatment Performed - Bullet Perforation
1944-02-06 Perforation Treatment Performed - Bullet Perforation
1944-02-08 Perforation Treatment Performed - Acid Wash - No Pressure
1948-04-29 Perforation Treatment Performed - Cement Squeeze
1948-08-28 Finished Drilling
1948-08-28 Perforation Treatment Performed - Open-Hole Completion
1948-08-28 Well Mode changed to Drilled and Cased
1948-09-03 Liner Casing Operation Performed
1948-09-03 Perforation Treatment Performed - Open-Hole Completion
1948-09-10 Well Began Production
1948-09-10 Well Fluid changed to Crude Oil
1948-09-10 Well Mode changed to Flowing
1948-09-11 Perforation Treatment Performed - Acid Wash - No Pressure
1948-09-21 Perforation Treatment Performed - Bullet Perforation
1948-09-22 Perforation Treatment Performed - Acid Wash - No Pressure
1976-01-22 Well Fluid changed to Crude Oil
1976-01-22 Well Mode changed to Pumping
1976-06-09 Perforation Treatment Performed - Jet Perforation
1976-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-01 Well Fluid changed to Crude Oil
1982-11-01 Well Mode changed to Suspended
1989-08-03 Well Fluid changed to Crude Oil
1989-08-03 Well Mode changed to Pumping
1994-10-31 Well Fluid changed to Crude Oil
1994-10-31 Well Mode changed to Suspended
1997-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-21 Perforation Treatment Performed - Cement Squeeze
1997-12-21 Plug Back Performed
1997-12-21 Well Fluid changed to Crude Oil
1997-12-21 Well Mode changed to Abandoned Zone
1998-01-07 Perforation Treatment Performed - Cement Plug
1998-01-09 Perforation Treatment Performed - Jet Perforation
1998-01-10 Perforation Treatment Performed - Remedial Casing
1998-01-15 Perforation Treatment Performed - Jet Perforation
1998-01-16 Perforation Treatment Performed - Cement Plug
1998-01-16 Perforation Treatment Performed - Remedial Casing
1998-07-21 Well Fluid changed to Crude Oil
1998-07-21 Well Mode changed to Abandoned
2016-06-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1944-01-02 Open Hole/Barefoot Completion 1831.20 1911.40 0
1948-09-03 Open Hole/Barefoot Completion 2401.80 2565.80 0
1948-09-11 Acid Wash 2460.00 2563.40 0
1948-09-21 Bullet Perforation 2360.10 2386.60 0
1948-09-22 Acid Wash 2360.10 2386.60 0
1976-06-09 Perforation 1795.60 1800.50 7
1976-06-09 Perforation 1805.30 1811.10 7
1976-06-10 Acid Treatment 1795.60 1811.10 0
1997-12-21 Cement Squeeze 1795.60 2565.80 0
1997-12-21 Packing Device Capped w/Cement 1725.00 1769.00 0
1998-01-07 Cement Plug 900.00 1348.00 0
1944-01-03 Acid Wash 1880.60 1905.00 0
1998-01-09 Perforation 800.00 801.00 13
1998-01-10 Remedial Casing Cementing 800.00 801.00 0
1998-01-15 Perforation 190.00 191.00 13
1998-01-16 Remedial Casing Cementing 190.00 191.00 0
1998-01-16 Cement Plug 146.00 191.00 0
1944-01-04 Acid Wash 1880.60 1905.00 0
1944-01-06 Acid Wash 1880.60 1905.00 0
1944-02-01 Bullet Perforation 1805.90 1810.50 10
1944-02-06 Bullet Perforation 1796.20 1799.80 10
1944-02-08 Acid Wash 1796.20 1810.50 0
1948-04-29 Cement Squeeze 1796.20 1911.40 0
1948-08-28 Open Hole/Barefoot Completion 1831.20 2565.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1930 0.0 0.0 0.0
1968 3851 0.0 0.0 0.0
1969 3656 0.0 0.0 0.0
1970 4055 0.0 0.0 0.0
1971 631 0.0 0.0 0.0
1973 714 0.0 0.0 0.0
1974 92 0.0 0.0 0.0
1976 7047 0.0 0.0 0.0
1977 8067 0.0 0.0 0.0
1978 8759 0.0 0.0 0.0
1979 7837 0.0 0.0 0.0
1980 8243 0.0 0.0 0.0
1981 8323 0.0 0.0 0.0
1982 3345 0.0 0.0 0.0
1989 3168 0.0 0.0 0.0
1990 8538 0.0 0.0 0.0
1991 8085 0.0 0.0 0.0
1992 7809 0.0 0.0 0.0
1993 4873 0.0 0.0 0.0

For data sources see[5]

References