X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205031412000

Well Details

Well ID: 0205031412000
Loading map...
Location: 00/12-14-020-03W5/0
Location Alias: 00/12-14-20-03 W5M
Location Alias 2: 00/12-14-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 14
County/Municipality: Foothills County
Well Name: ROYALITE 56
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: B0000159
License Date: 1940-11-12
License Status: RecCertified
Spud Date: 1941-02-14
Final Drill Date: 1941-06-30
Well Total Depth: 2411.60 m
Surface Hole Latitude: 50.697605
Surface Hole Longitude: -114.322002

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-11-12 Obtained License
1941-06-15 Production Casing Operation Performed
1941-06-29 Well Mode changed to Drilled and Cased
1941-06-30 Finished Drilling
1941-06-30 Perforation Treatment Performed - Open-Hole Completion
1941-06-30 Well Began Production
1941-06-30 Well Fluid changed to Crude Oil
1941-06-30 Well Mode changed to Flowing
1941-07-01 Perforation Treatment Performed - Acid Wash - No Pressure
1941-07-05 Perforation Treatment Performed - Acid Wash - No Pressure
1941-07-10 Perforation Treatment Performed - Acid Wash - No Pressure
1941-07-11 Perforation Treatment Performed - Acid Wash - No Pressure
1941-07-16 Perforation Treatment Performed - Acid Wash - No Pressure
1941-10-04 Perforation Treatment Performed - Fractured
1941-10-29 Perforation Treatment Performed - Fractured
1941-11-10 Perforation Treatment Performed - Acid Wash - No Pressure
1941-11-20 Perforation Treatment Performed - Acid Wash - No Pressure
1960-06-14 Well Fluid changed to Crude Oil
1960-06-14 Well Mode changed to Suspended
1975-10-15 Perforation Treatment Performed - Cement Plug
1975-10-18 Perforation Treatment Performed - Cement Plug
1975-10-18 Well Abandoned
1975-10-18 Well Fluid changed to Crude Oil
1975-10-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1941-06-30 Open Hole/Barefoot Completion 2270.20 2411.60 0
1941-11-20 Acid Wash 2304.30 2331.70 0
1975-10-15 Cement Plug 2135.40 2195.20 0
1975-10-18 Cement Plug 352.00 416.10 0
1941-07-01 Acid Wash 2270.20 2411.60 0
1941-07-05 Acid Wash 2270.20 2411.60 0
1941-07-10 Acid Wash 2270.20 2411.60 0
1941-07-11 Acid Wash 2270.20 2411.60 0
1941-07-16 Acid Wash 2270.20 2411.60 0
1941-10-04 Fracture 2389.60 2401.80 0
1941-10-29 Fracture 2304.30 2331.70 0
1941-11-10 Acid Wash 2304.30 2331.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References