X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205030116040

Well Details

Well ID: 0205030116040
Loading map...
Location: 04/16-01-020-03W5/0
Location Alias: 04/16-01-20-03 W5M
Location Alias 2: 04/16-01-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 01
County/Municipality: Turner Valley
Well Name: CPEC MCLEOD 4 TV 16-1-20-3
Operator Name: Crescent Point Energy Corp.
License Number: 0012001
License Date: 1956-08-28
License Status: Abandoned
Spud Date: 1928-03-13
Final Drill Date: 1932-11-18
Well Total Depth: 2362.50 m
Surface Hole Latitude: 50.672640
Surface Hole Longitude: -114.279870

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1928-08-25 Production Casing Operation Performed
1928-09-05 Perforation Treatment Performed - Open-Hole Completion
1929-09-14 Perforation Treatment Performed - Open-Hole Completion
1932-11-18 Finished Drilling
1932-11-18 Perforation Treatment Performed - Open-Hole Completion
1932-11-18 Well Mode changed to Drilled and Cased
1932-11-19 Well Began Production
1932-11-19 Well Fluid changed to Gas
1932-11-19 Well Mode changed to Flowing
1933-04-25 Well Fluid changed to Gas
1933-04-25 Well Mode changed to Flowing
1933-12-01 Well Fluid changed to Gas
1933-12-01 Well Mode changed to Flowing
1956-08-28 Obtained License
2018-03-20 Well Log Performed
2018-03-22 Well Log Performed
2018-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-28 Perforation Treatment Performed - Cement Squeeze
2018-03-28 Plug Back Performed
2018-04-04 Perforation Treatment Performed - Jet Perforation
2018-04-04 Well Log Performed
2018-04-05 Perforation Treatment Performed - Remedial Casing
2018-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-06 Plug Back Performed
2018-04-09 Perforation Treatment Performed - Jet Perforation
2018-04-09 Perforation Treatment Performed - Remedial Casing
2018-04-10 Perforation Treatment Performed - Jet Perforation
2018-04-10 Perforation Treatment Performed - Remedial Casing
2018-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-11 Plug Back Performed
2018-04-12 Perforation Treatment Performed - Jet Perforation
2018-04-12 Perforation Treatment Performed - Remedial Casing
2018-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-13 Plug Back Performed
2018-04-16 Perforation Treatment Performed - Jet Perforation
2018-04-16 Perforation Treatment Performed - Remedial Casing
2018-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-17 Plug Back Performed
2018-04-18 Perforation Treatment Performed - Jet Perforation
2018-04-19 Perforation Treatment Performed - Jet Perforation
2018-04-19 Perforation Treatment Performed - Remedial Casing
2018-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-20 Plug Back Performed
2018-04-23 Perforation Treatment Performed - Jet Perforation
2018-04-23 Perforation Treatment Performed - Remedial Casing
2018-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-24 Plug Back Performed
2018-04-24 Well Fluid changed to Gas
2018-04-24 Well Mode changed to Abandoned Zone
2019-03-04 Well Abandoned
2019-03-04 Well Fluid changed to Gas
2019-03-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1928-09-05 Open Hole/Barefoot Completion 1137.50 1152.40 0
2018-04-09 Remedial Casing Cementing 965.00 966.00 0
2018-04-10 Perforation 890.00 891.00 17
2018-04-10 Remedial Casing Cementing 890.00 891.00 0
2018-04-11 Packing Device Capped w/Cement 822.70 896.00 0
2018-04-12 Perforation 712.00 713.00 17
2018-04-12 Remedial Casing Cementing 712.00 713.00 0
2018-04-13 Packing Device Capped w/Cement 697.00 708.00 0
2018-04-16 Perforation 635.00 636.00 17
2018-04-16 Perforation 599.00 600.00 17
2018-04-16 Remedial Casing Cementing 635.00 636.00 0
1929-09-14 Open Hole/Barefoot Completion 1137.50 1594.10 0
2018-04-16 Remedial Casing Cementing 599.00 600.00 0
2018-04-17 Packing Device Capped w/Cement 580.00 605.00 0
2018-04-18 Perforation 430.00 431.00 17
2018-04-19 Perforation 315.00 316.00 17
2018-04-19 Remedial Casing Cementing 315.00 316.00 0
2018-04-20 Packing Device Capped w/Cement 285.30 320.00 0
2018-04-23 Perforation 140.00 141.00 17
2018-04-23 Remedial Casing Cementing 140.00 141.00 0
2018-04-24 Packing Device Capped w/Cement 125.50 135.00 0
1932-11-18 Open Hole/Barefoot Completion 1137.50 2362.50 0
2018-03-28 Cement Squeeze 1137.50 2362.50 0
2018-03-28 Packing Device Capped w/Cement 1052.20 1095.00 0
2018-04-04 Perforation 1030.50 1032.50 20
2018-04-05 Remedial Casing Cementing 1030.50 1032.50 0
2018-04-06 Packing Device Capped w/Cement 987.50 1025.00 0
2018-04-09 Perforation 965.00 966.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 7955 0.0 0.0 0.0
1985 4687 0.0 0.0 0.0
1986 6320 0.0 0.0 0.0
1987 8198 0.0 0.0 0.0
1988 8293 0.0 0.0 0.0
1989 8293 0.0 0.0 0.0
1990 8332 0.0 0.0 0.0
1991 7954 0.0 0.0 0.0
1992 7846 0.0 0.0 0.0
1993 8228 0.0 0.0 0.0
1994 8263 0.0 0.0 0.0
1995 8495 0.0 0.0 0.0
1996 8645 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8224 0.0 0.0 0.0
1999 8617 0.0 0.0 0.0
2000 8777 0.0 0.0 0.0
2001 5971 0.0 0.0 0.0
2002 8420 0.0 0.0 0.0
2003 8533 0.0 0.0 0.0
2004 7982 0.0 0.0 0.0
2005 7071 0.0 0.0 0.0
2006 8507 0.0 0.0 0.0
2007 4977 0.0 0.0 0.0
2008 4934 0.0 0.0 0.0
2009 7437 0.0 0.0 0.0
2010 7294 0.0 0.0 0.0
2011 7527 0.0 0.0 0.0
2012 8705 0.0 0.0 0.0
2013 7526 0.0 0.0 0.0
2014 7237 0.0 0.0 0.0
2015 8529 0.0 0.0 0.0
2016 8358 0.0 0.0 0.0
2017 7812 0.0 0.0 0.0
2018 1640 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References