X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205030108020

Well Details

Well ID: 0205030108020
Loading map...
Location: 02/08-01-020-03W5/0
Location Alias: 02/08-01-20-03 W5M
Location Alias 2: 02/08-01-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 01
County/Municipality: Turner Valley
Well Name: CPEC FOOTHILLS DOLO.2 TV 8-1-20-3
Operator Name: Crescent Point Energy Corp.
License Number: 0011993
License Date: 1956-08-28
License Status: Issued
Spud Date: 1926-10-18
Final Drill Date: 1928-11-20
Well Total Depth: 1129.90 m
Surface Hole Latitude: 50.666270
Surface Hole Longitude: -114.279871

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1928-01-01 Production Casing Operation Performed
1928-11-20 Finished Drilling
1928-11-20 Perforation Treatment Performed - Open-Hole Completion
1928-11-20 Well Mode changed to Drilled and Cased
1928-11-24 Well Began Production
1928-11-24 Well Fluid changed to Gas
1928-11-24 Well Mode changed to Flowing
1929-03-18 Perforation Treatment Performed - Cement Squeeze
1929-03-18 Well Fluid changed to Gas
1929-03-18 Well Mode changed to Abandoned Zone
1956-08-28 Obtained License

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1928-11-20 Open Hole/Barefoot Completion 1026.00 1129.90 0
1929-03-18 Cement Squeeze 1026.00 1129.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References