If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205021212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.682468,"lon":-114.160433,"icon":""}]} |
Location: 00/12-12-020-02W5/0 | |
Location Alias: 00/12-12-20-02 W5M | |
Location Alias 2: 00/12-12-020-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 02 | |
Section: 12 | |
County/Municipality: Foothills County | |
Well Name: SHELL PINECREEK 12-12-20-2 | |
Operator Name: Shell Canada Limited | |
License Number: B0002219 | |
License Date: 1948-07-24 | |
License Status: Re-Entered | |
Spud Date: 1948-08-03 | |
Final Drill Date: 1949-02-17 | |
Well Total Depth: 2837.40 m | |
Surface Hole Latitude: 50.682468 | |
Surface Hole Longitude: -114.160433 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-07-24 | Obtained License |
1949-01-10 | Production Casing Operation Performed |
1949-01-25 | Drill Stem Test Performed |
1949-01-30 | Drill Stem Test Performed |
1949-01-31 | Drill Stem Test Performed |
1949-02-04 | Drill Stem Test Performed |
1949-02-15 | Drill Stem Test Performed |
1949-02-17 | Finished Drilling |
1949-02-17 | Perforation Treatment Performed - Open-Hole Completion |
1949-02-17 | Well Mode changed to Drilled and Cased |
1949-02-18 | Drill Stem Test Performed |
1949-02-19 | Perforation Treatment Performed - Cement Plug |
1949-02-19 | Perforation Treatment Performed - Open-Hole Completion |
1949-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-03-10 | Perforation Treatment Performed - Cement Plug |
1949-03-10 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-02-17 | Open Hole/Barefoot Completion | 2734.70 | 2837.40 | 0 |
1949-02-19 | Cement Plug | 2769.10 | 2837.40 | 0 |
1949-02-19 | Open Hole/Barefoot Completion | 2734.70 | 2769.10 | 0 |
1949-02-25 | Acid Treatment | 2734.70 | 2769.10 | 0 |
1949-03-02 | Acid Treatment | 2734.70 | 2769.10 | 0 |
1949-03-04 | Acid Treatment | 2734.70 | 2769.10 | 0 |
1949-03-06 | Acid Treatment | 2734.70 | 2769.10 | 0 |
1949-03-10 | Cement Plug | 2699.00 | 2750.80 | 0 |
For data sources see[4]