X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205021206000

Well Details

Well ID: 0205021206000
Loading map...
Location: 00/06-12-020-02W5/0
Location Alias: 00/06-12-20-02 W5M
Location Alias 2: 00/06-12-020-02 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 02
Section: 12
County/Municipality: Foothills County
Well Name: SUN PACIFIC BLACK DIAMOND 6-12-20-2
Operator Name: Suncor Energy Inc.
License Number: 0034031
License Date: 1968-04-25
License Status: RecCertified
Spud Date: 1968-05-10
Final Drill Date: 1968-06-13
Well Total Depth: 2857.50 m
Surface Hole Latitude: 50.678332
Surface Hole Longitude: -114.156228

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-04-25 Obtained License
1968-06-08 Drill Stem Test Performed
1968-06-12 Drill Stem Test Performed
1968-06-13 Finished Drilling
1968-06-16 Production Casing Operation Performed
1968-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-06-26 Perforation Treatment Performed - Jet Perforation
1968-06-28 Perforation Treatment Performed - Cement Squeeze
1968-06-30 Perforation Treatment Performed - Jet Perforation
1968-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-03 Perforation Treatment Performed - Cement Squeeze
1968-07-06 Perforation Treatment Performed - Jet Perforation
1968-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-31 Well Mode changed to Drilled and Cased
1973-05-07 Well Fluid changed to Gas
1973-05-07 Well Mode changed to Testing
1973-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-05-08 Well Abandoned
1973-05-08 Well Fluid changed to Gas
1973-05-08 Well Mode changed to Abandoned
1973-05-10 Perforation Treatment Performed - Cement Plug
1973-05-12 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-06-26 Perforation 2774.30 2776.10 7
1968-07-12 Acid Treatment 2740.80 2748.10 0
1973-05-08 Packing Device Capped w/Cement 2724.90 2724.90 0
1973-05-10 Cement Plug 685.80 716.30 0
1973-05-12 Cement Plug 292.60 330.70 0
1968-06-26 Acid Treatment 2774.30 2776.10 0
1968-06-28 Cement Squeeze 2774.30 2776.10 0
1968-06-30 Perforation 2762.40 2764.50 7
1968-07-01 Acid Treatment 2762.40 2764.50 0
1968-07-03 Cement Squeeze 2762.40 2764.50 0
1968-07-06 Perforation 2740.80 2743.80 3
1968-07-06 Perforation 2745.30 2748.10 3
1968-07-07 Acid Treatment 2740.80 2748.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0

For data sources see[5]

References