If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204271610022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.695644,"lon":-113.681569,"icon":""}]} |
Location: 02/10-16-020-27W4/2 | |
Location Alias: 02/10-16-20-27 W4M | |
Location Alias 2: 02/10-16-020-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 27 | |
Section: 16 | |
County/Municipality: Foothills County | |
Well Name: CPC ET AL 02 GLADYS 10-16-20-27 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0191716 | |
License Date: 1996-09-25 | |
License Status: Issued | |
Spud Date: 1996-10-02 | |
Final Drill Date: 1996-10-27 | |
Well Total Depth: 2338.00 m | |
Surface Hole Latitude: 50.695644 | |
Surface Hole Longitude: -113.681569 |
Date | Event |
---|---|
1996-09-25 | Obtained License |
1996-10-04 | Surface Casing Operation Performed |
1996-10-14 | Direction Drilling Operation Performed - Horizontal |
1996-10-23 | Production Casing Operation Performed |
1996-10-27 | Finished Drilling |
1996-10-27 | Perforation Treatment Performed - Open-Hole Completion |
1996-10-27 | Well Mode changed to Drilled and Cased |
1996-10-29 | Rig Released |
1996-10-30 | Well Log Performed |
2001-09-15 | Perforation Treatment Performed - Jet Perforation |
2001-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-28 | Plug Back Performed |
2003-08-28 | Well Log Performed |
2003-08-30 | Perforation Treatment Performed - Jet Perforation |
2003-09-02 | Perforation Treatment Performed - Fractured |
2003-09-05 | Perforation Treatment Performed - Jet Perforation |
2003-09-05 | Well Log Performed |
2003-09-07 | Perforation Treatment Performed - Fractured |
2003-09-08 | Perforation Treatment Performed - Jet Perforation |
2003-09-09 | Perforation Treatment Performed - Fractured |
2003-10-10 | Well Began Production |
2003-10-10 | Well Fluid changed to Gas |
2003-10-10 | Well Mode changed to Flowing |
2019-08-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-08-08 | Plug Back Performed |
2019-08-08 | Well Log Performed |
2019-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-08-12 | Perforation Treatment Performed - Cement Squeeze |
2019-08-12 | Perforation Treatment Performed - Jet Perforation |
2019-08-12 | Plug Back Performed |
2019-08-12 | Well Fluid changed to Gas |
2019-08-12 | Well Log Performed |
2019-08-12 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-10-14 | 1890.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-10-27 | Open Hole/Barefoot Completion | 2165.00 | 2338.00 | 0 |
2003-09-08 | Perforation | 982.50 | 985.00 | 14 |
2003-09-08 | Perforation | 977.00 | 980.00 | 14 |
2003-09-09 | Fracture | 977.00 | 985.00 | 0 |
2019-08-08 | Packing Device Capped w/Cement | 1143.00 | 1151.00 | 0 |
2019-08-12 | Packing Device Capped w/Cement | 956.00 | 964.00 | 0 |
2019-08-12 | Perforation | 466.00 | 467.00 | 17 |
2019-08-12 | Cement Squeeze | 466.00 | 467.00 | 0 |
2019-08-12 | Packing Device Capped w/Cement | 451.00 | 463.00 | 0 |
2001-09-15 | Perforation | 2156.00 | 2160.00 | 14 |
2001-09-16 | Acid Treatment | 2156.00 | 2160.00 | 0 |
2003-08-28 | Packing Device Capped w/Cement | 2087.00 | 2147.00 | 0 |
2003-08-30 | Perforation | 1164.50 | 1166.50 | 26 |
2003-08-30 | Perforation | 1160.50 | 1162.50 | 26 |
2003-09-02 | Fracture | 1160.50 | 1166.50 | 0 |
2003-09-05 | Perforation | 1026.00 | 1029.50 | 14 |
2003-09-07 | Fracture | 1026.00 | 1029.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1626 | 0.0 | 0.0 | 0.0 |
2004 | 8222 | 0.0 | 0.0 | 0.0 |
2005 | 8367 | 0.0 | 0.0 | 0.0 |
2006 | 8426 | 0.0 | 0.0 | 0.0 |
2007 | 8347 | 0.0 | 0.0 | 0.0 |
2008 | 8492 | 0.0 | 0.0 | 0.0 |
2009 | 8577 | 0.0 | 0.0 | 0.0 |
2010 | 8563 | 0.0 | 0.0 | 0.0 |
2011 | 8420 | 0.0 | 0.0 | 0.0 |
2012 | 8624 | 0.0 | 0.0 | 0.0 |
2013 | 6757 | 0.0 | 0.0 | 0.0 |
2014 | 5916 | 0.0 | 0.0 | 0.0 |
2015 | 6672 | 0.0 | 0.0 | 0.0 |
2016 | 4087 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-08-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]