X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204241110000

Well Details

Well ID: 0204241110000
Loading map...
Location: 00/10-11-020-24W4/0
Location Alias: 00/10-11-20-24 W4M
Location Alias 2: 00/10-11-020-24 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 24
Section: 11
County/Municipality: Vulcan County
Well Name: CYPRESS FARROW 10-11-20-24
Operator Name: TAQA North Ltd.
License Number: 0026422
License Date: 1964-07-06
License Status: Suspension
Spud Date: 1964-07-08
Final Drill Date: 1964-08-16
Well Total Depth: 2692.30 m
Surface Hole Latitude: 50.683272
Surface Hole Longitude: -113.222052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-07-06 Obtained License
1964-07-22 Drill Stem Test Performed
1964-07-23 Drill Stem Test Performed
1964-08-05 Drill Stem Test Performed
1964-08-16 Finished Drilling
1964-08-19 Production Casing Operation Performed
1964-08-19 Well Mode changed to Drilled and Cased
1978-05-28 Perforation Treatment Performed - Jet Perforation
1978-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-19 Perforation Treatment Performed - Jet Perforation
1981-12-21 Perforation Treatment Performed - Fractured
1982-01-09 Perforation Treatment Performed - Fractured
1985-08-20 Well Began Production
1985-08-20 Well Fluid changed to Gas
1985-08-20 Well Mode changed to Flowing
1986-09-24 Perforation Treatment Performed - Jet Perforation
1996-11-05 Perforation Treatment Performed - Jet Perforation
2005-12-29 Well Fluid changed to Gas
2005-12-29 Well Mode changed to Suspended
2008-07-19 Well Log Performed
2008-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-21 Plug Back Performed
2008-07-21 Well Fluid changed to Gas
2008-07-21 Well Mode changed to Abandoned Zone
2014-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-27 Perforation Treatment Performed - Jet Perforation
2014-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-28 Perforation Treatment Performed - Cement Squeeze
2014-09-29 Perforation Treatment Performed - Cement Plug
2014-09-29 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-05-28 Perforation 1744.70 1746.50 7
2014-09-27 Packing Device Capped w/Cement 531.00 600.00 0
2014-09-27 Perforation 530.00 531.00 17
2014-09-28 Cement Squeeze 530.00 531.00 0
2014-09-28 Packing Device Capped w/Cement 514.00 523.00 0
2014-09-29 Cement Plug 350.00 514.00 0
1978-05-29 Acid Treatment 1744.70 1746.50 0
1981-12-19 Perforation 1744.70 1746.70 13
1981-12-21 Fracture 1744.70 1746.70 0
1982-01-09 Fracture 1744.70 1746.70 0
1986-09-24 Perforation 1743.50 1747.00 13
1996-11-05 Perforation 1735.30 1736.80 13
1996-11-05 Perforation 1750.70 1752.20 13
2008-07-21 Packing Device Capped w/Cement 1722.00 1730.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 743 0.0 0.0 0.0
1986 2203 0.0 0.0 0.0
1987 6439 0.0 0.0 0.0
1988 8328 0.0 0.0 0.0
1989 8457 0.0 0.0 0.0
1990 6456 0.0 0.0 0.0
1991 3987 0.0 0.0 0.0
1992 5136 0.0 0.0 0.0
1993 6695 0.0 0.0 0.0
1994 7276 0.0 0.0 0.0
1995 8298 0.0 0.0 0.0
1996 6740 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References