If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204173310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.741744,"lon":-112.297425,"icon":""}]} |
Location: 00/10-33-020-17W4/0 | |
Location Alias: 00/10-33-20-17 W4M | |
Location Alias 2: 00/10-33-020-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 17 | |
Section: 33 | |
County/Municipality: County of Newell | |
Well Name: CVE COUNTESS 10-33-20-17 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0034938 | |
License Date: 1968-10-08 | |
License Status: RecCertified | |
Spud Date: 1968-10-14 | |
Final Drill Date: 1968-10-18 | |
Well Total Depth: 1225.30 m | |
Surface Hole Latitude: 50.741744 | |
Surface Hole Longitude: -112.297425 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1968-10-08 | Obtained License |
1968-10-18 | Finished Drilling |
1968-10-19 | Drill Stem Test Performed |
1968-10-20 | Drill Stem Test Performed |
1968-10-21 | Production Casing Operation Performed |
1970-02-10 | Well Mode changed to Drilled and Cased |
1982-09-24 | Perforation Treatment Performed - Jet Perforation |
1982-10-07 | Perforation Treatment Performed - Fractured |
1983-03-01 | Well Began Production |
1983-03-01 | Well Fluid changed to Gas |
1983-03-01 | Well Mode changed to Flowing |
1989-09-06 | Perforation Treatment Performed - Fractured |
1990-04-19 | Perforation Treatment Performed - Chemical Squeeze |
1993-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-12-17 | Perforation Treatment Performed - Jet Perforation |
1993-12-17 | Plug Back Performed |
1993-12-17 | Well Log Performed |
1993-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-12-18 | Perforation Treatment Performed - Remedial Casing |
1993-12-18 | Well Fluid changed to Gas |
1993-12-18 | Well Mode changed to Abandoned |
1993-12-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-09-24 | Perforation | 1152.40 | 1153.40 | 13 |
1982-09-24 | Perforation | 1155.80 | 1160.10 | 13 |
1982-10-07 | Fracture | 1152.40 | 1160.10 | 0 |
1989-09-06 | Fracture | 1152.40 | 1160.10 | 0 |
1990-04-19 | Chemical Squeeze | 1152.40 | 1160.10 | 0 |
1993-12-17 | Packing Device Capped w/Cement | 1137.00 | 1145.00 | 0 |
1993-12-17 | Perforation | 257.00 | 258.00 | 13 |
1993-12-18 | Acid Treatment | 257.00 | 258.00 | 0 |
1993-12-18 | Remedial Casing Cementing | 257.00 | 258.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 2296 | 0.0 | 0.0 | 0.0 |
1984 | 1819 | 0.0 | 0.0 | 0.0 |
1985 | 154 | 0.0 | 0.0 | 0.0 |
1986 | 1212 | 0.0 | 0.0 | 0.0 |
1987 | 579 | 0.0 | 0.0 | 0.0 |
1988 | 774 | 0.0 | 0.0 | 0.0 |
1989 | 704 | 0.0 | 0.0 | 0.0 |
1990 | 826 | 0.0 | 0.0 | 0.0 |
For data sources see[5]