If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204120604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.660349,"lon":-111.664836,"icon":""}]} |
Location: 00/04-06-020-12W4/0 | |
Location Alias: 00/04-06-20-12 W4M | |
Location Alias 2: 00/04-06-020-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 12 | |
Section: 06 | |
County/Municipality: County of Newell | |
Well Name: PATRICIA CPR NO. 1 | |
Operator Name: Chevron Canada Limited | |
License Number: B0001079 | |
License Date: 1945-08-22 | |
License Status: RecCertified | |
Spud Date: 1945-08-29 | |
Final Drill Date: 1945-10-19 | |
Well Total Depth: 1316.40 m | |
Surface Hole Latitude: 50.660349 | |
Surface Hole Longitude: -111.664836 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1945-08-22 | Obtained License |
1945-09-17 | Drill Stem Test Performed |
1945-09-19 | Drill Stem Test Performed |
1945-10-07 | Drill Stem Test Performed |
1945-10-13 | Drill Stem Test Performed |
1945-10-19 | Finished Drilling |
1945-10-22 | Production Casing Operation Performed |
1945-10-22 | Well Mode changed to Drilled and Cased |
1956-07-09 | Perforation Treatment Performed - Jet Perforation |
1956-07-09 | Well Mode changed to Drilled and Cased |
1964-07-07 | Well Began Production |
1964-07-07 | Well Fluid changed to Gas |
1964-07-07 | Well Mode changed to Flowing |
1964-08-17 | Perforation Treatment Performed - Selective Bullet Perforations |
1964-08-18 | Perforation Treatment Performed - Cement Plug |
1964-08-19 | Perforation Treatment Performed - Cement Plug |
1964-08-22 | Perforation Treatment Performed - Jet Perforation |
1964-11-18 | Well Fluid changed to Gas |
1964-11-18 | Well Mode changed to Suspended |
1968-09-03 | Perforation Treatment Performed - Cement Plug |
1976-03-16 | Perforation Treatment Performed - Jet Perforation |
1976-03-17 | Perforation Treatment Performed - Cement Squeeze |
1976-03-17 | Perforation Treatment Performed - Jet Perforation |
1976-03-17 | Well Abandoned |
1976-03-17 | Well Fluid changed to Gas |
1976-03-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-07-09 | Perforation | 1007.70 | 1013.80 | 20 |
1976-03-17 | Cement Squeeze | 326.10 | 332.20 | 0 |
1964-08-17 | Selective Bullet Perforations | 990.60 | 990.60 | 0 |
1964-08-18 | Cement Plug | 1012.50 | 1012.50 | 0 |
1964-08-19 | Cement Plug | 990.60 | 990.60 | 0 |
1964-08-22 | Perforation | 1007.70 | 1010.10 | 10 |
1968-09-03 | Cement Plug | 940.60 | 1010.10 | 0 |
1976-03-16 | Perforation | 670.60 | 679.70 | 3 |
1976-03-17 | Cement Squeeze | 670.60 | 679.70 | 0 |
1976-03-17 | Perforation | 326.10 | 332.20 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1964 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]