X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204103606000

Well Details

Well ID: 0204103606000
Loading map...
Location: 00/06-36-020-10W4/0
Location Alias: 00/06-36-20-10 W4M
Location Alias 2: 00/06-36-020-10 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 36
County/Municipality: Special Areas No. 2
Well Name: CNRL PRINCESS 6-36-20-10
Operator Name: Canadian Natural Resources Limited
License Number: 0052939
License Date: 1975-02-14
License Status: Issued
Spud Date: 1975-02-20
Final Drill Date: 1975-02-22
Well Total Depth: 713.20 m
Surface Hole Latitude: 50.739108
Surface Hole Longitude: -111.263258

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-14 Obtained License
1975-02-22 Finished Drilling
1975-02-22 Well Log Performed
1975-02-22 Well Mode changed to Drilled and Cased
1975-02-23 Production Casing Operation Performed
1975-10-19 Perforation Treatment Performed - Jet Perforation
1975-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-31 Perforation Treatment Performed - Fractured
1975-11-16 Perforation Treatment Performed - Jet Perforation
1975-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-18 Perforation Treatment Performed - Fractured
1976-02-05 Well Began Production
1976-02-05 Well Fluid changed to Gas
1976-02-05 Well Mode changed to Flowing
1987-10-01 Well Fluid changed to Gas
1987-10-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-19 Perforation 688.80 690.10 13
1975-11-16 Perforation 445.00 445.30 7
1975-11-18 Acid Treatment 502.90 509.00 0
1975-11-18 Fracture 502.90 509.00 0
1975-11-18 Fracture 420.60 445.30 0
1975-10-31 Acid Treatment 688.80 690.10 0
1975-10-31 Fracture 688.80 690.10 0
1975-11-16 Perforation 502.90 503.50 13
1975-11-16 Perforation 508.40 509.00 13
1975-11-16 Perforation 420.60 420.90 7
1975-11-16 Perforation 428.20 428.50 7
1975-11-16 Perforation 433.70 434.60 7
1975-11-16 Perforation 436.20 436.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5710 0.0 0.0 0.0
1977 8438 0.0 0.0 0.0
1978 8560 0.0 0.0 0.0
1979 8308 0.0 0.0 0.0
1980 8537 0.0 0.0 0.0
1981 8717 0.0 0.0 0.0
1982 8648 0.0 0.0 0.0
1983 8532 0.0 0.0 0.0
1984 8166 0.0 0.0 0.0
1985 8700 0.0 0.0 0.0
1986 8562 0.0 0.0 0.0
1987 8427 0.0 0.0 0.0
1988 8508 0.0 0.0 0.0
1989 8741 0.0 0.0 0.0
1990 8742 0.0 0.0 0.0
1991 8730 0.0 0.0 0.0
1992 8736 0.0 0.0 0.0
1993 8611 0.0 0.0 0.0
1994 8650 0.0 0.0 0.0
1995 8040 0.0 0.0 0.0
1996 8627 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8624 0.0 0.0 0.0
2000 8632 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 8692 0.0 0.0 0.0
2003 8715 0.0 0.0 0.0
2004 5856 0.0 0.0 0.0
2005 8734 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8697 0.0 0.0 0.0
2008 8655 0.0 0.0 0.0
2009 8737 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 8761 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8751 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8714 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References