X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204103411000

Well Details

Well ID: 0204103411000
Loading map...
Location: 00/11-34-020-10W4/0
Location Alias: 00/11-34-20-10 W4M
Location Alias 2: 00/11-34-020-10 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 34
County/Municipality: Special Areas No. 2
Well Name: CNRL PRINCESS 11-34-20-10
Operator Name: Canadian Natural Resources Limited
License Number: 0046029
License Date: 1973-06-05
License Status: Issued
Spud Date: 1973-08-14
Final Drill Date: 1973-08-15
Well Total Depth: 478.80 m
Surface Hole Latitude: 50.742658
Surface Hole Longitude: -111.314178

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-05 Obtained License
1973-08-15 Finished Drilling
1973-08-15 Production Casing Operation Performed
1973-08-15 Well Mode changed to Drilled and Cased
1975-09-27 Perforation Treatment Performed - Bullet Perforation
1975-09-27 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-03 Perforation Treatment Performed - Fractured
1976-01-26 Well Began Production
1976-01-26 Well Fluid changed to Gas
1976-01-26 Well Mode changed to Flowing
2004-12-20 Well Log Performed
2005-01-23 Perforation Treatment Performed - Jet Perforation
2005-02-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-27 Bullet Perforation 438.90 439.80 3
2005-01-23 Perforation 391.50 392.50 13
2005-01-23 Perforation 403.50 404.50 13
2005-01-23 Perforation 425.50 426.50 13
2005-02-09 Fracture 376.50 426.50 0
1975-09-27 Bullet Perforation 440.40 441.40 3
1975-09-27 Selective Bullet Perforations 445.00 446.50 0
1975-09-27 Bullet Perforation 448.40 448.70 3
1975-09-27 Bullet Perforation 452.30 452.60 3
1975-09-27 Selective Bullet Perforations 453.80 454.80 0
1975-09-27 Bullet Perforation 457.20 457.80 3
1975-10-03 Fracture 438.90 457.80 0
2005-01-23 Perforation 376.50 377.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7116 0.0 0.0 0.0
1977 7890 0.0 0.0 0.0
1978 7739 0.0 0.0 0.0
1979 8513 0.0 0.0 0.0
1980 8555 0.0 0.0 0.0
1981 8411 0.0 0.0 0.0
1982 8681 0.0 0.0 0.0
1983 8735 0.0 0.0 0.0
1984 8019 0.0 0.0 0.0
1985 8063 0.0 0.0 0.0
1986 8724 0.0 0.0 0.0
1987 8749 0.0 0.0 0.0
1988 8574 0.0 0.0 0.0
1989 8706 0.0 0.0 0.0
1990 8744 0.0 0.0 0.0
1991 8095 0.0 0.0 0.0
1992 7970 0.0 0.0 0.0
1993 6707 0.0 0.0 0.0
1994 8644 0.0 0.0 0.0
1995 8042 0.0 0.0 0.0
1996 8647 0.0 0.0 0.0
1997 8705 0.0 0.0 0.0
1998 8738 0.0 0.0 0.0
1999 8621 0.0 0.0 0.0
2000 8619 0.0 0.0 0.0
2001 8677 0.0 0.0 0.0
2002 8702 0.0 0.0 0.0
2003 8706 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8718 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8719 0.0 0.0 0.0
2008 8651 0.0 0.0 0.0
2009 7249 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8733 0.0 0.0 0.0
2012 8761 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8751 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8714 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References