X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204102416000

Well Details

Well ID: 0204102416000
Loading map...
Location: 00/16-24-020-10W4/0
Location Alias: 00/16-24-20-10 W4M
Location Alias 2: 00/16-24-020-10 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 24
County/Municipality: Special Areas No. 2
Well Name: CNRL PRINCESS 16-24-20-10
Operator Name: Canadian Natural Resources Limited
License Number: 0053121
License Date: 1975-03-03
License Status: Issued
Spud Date: 1975-03-23
Final Drill Date: 1975-03-25
Well Total Depth: 536.40 m
Surface Hole Latitude: 50.717305
Surface Hole Longitude: -111.251837

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-03 Obtained License
1975-03-25 Finished Drilling
1975-03-25 Production Casing Operation Performed
1975-03-25 Well Mode changed to Drilled and Cased
1975-10-23 Perforation Treatment Performed - Jet Perforation
1975-10-23 Perforation Treatment Performed - Selective Jet Perforations
1975-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-03 Perforation Treatment Performed - Fractured
1976-01-27 Well Began Production
1976-01-27 Well Fluid changed to Gas
1976-01-27 Well Mode changed to Flowing
1997-11-05 Well Log Performed
1997-11-19 Perforation Treatment Performed - Fractured
1997-11-19 Perforation Treatment Performed - Jet Perforation
1997-11-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-23 Perforation 510.20 510.80 13
1997-11-19 Perforation 420.50 423.50 5
1997-11-19 Perforation 427.00 431.00 5
1997-11-19 Perforation 433.50 435.50 5
1997-11-19 Perforation 454.00 457.00 5
1997-11-19 Perforation 509.00 513.00 5
1997-11-19 Perforation 514.50 516.50 5
1997-11-19 Fracture 410.00 457.00 0
1997-11-21 Fracture 410.00 457.00 0
1975-10-23 Perforation 516.30 516.90 13
1975-10-23 Selective Jet Perforations 414.50 435.90 0
1975-10-23 Perforation 427.90 428.50 7
1975-10-23 Perforation 441.40 443.20 7
1975-11-03 Acid Treatment 510.20 516.90 0
1975-11-03 Fracture 510.20 516.90 0
1975-11-03 Fracture 414.50 443.20 0
1997-11-19 Perforation 410.00 414.50 5

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7251 0.0 0.0 0.0
1977 8572 0.0 0.0 0.0
1978 8756 0.0 0.0 0.0
1979 8513 0.0 0.0 0.0
1980 8557 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8678 0.0 0.0 0.0
1983 8734 0.0 0.0 0.0
1984 8689 0.0 0.0 0.0
1985 8718 0.0 0.0 0.0
1986 8713 0.0 0.0 0.0
1987 8678 0.0 0.0 0.0
1988 8509 0.0 0.0 0.0
1989 8737 0.0 0.0 0.0
1990 8744 0.0 0.0 0.0
1991 8731 0.0 0.0 0.0
1992 8741 0.0 0.0 0.0
1993 8564 0.0 0.0 0.0
1994 8650 0.0 0.0 0.0
1995 8040 0.0 0.0 0.0
1996 8627 0.0 0.0 0.0
1997 8515 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8624 0.0 0.0 0.0
2000 8632 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 8692 0.0 0.0 0.0
2003 8715 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8734 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8697 0.0 0.0 0.0
2008 8655 0.0 0.0 0.0
2009 8737 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 8761 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8751 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8714 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References