X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204102306000

Well Details

Well ID: 0204102306000
Loading map...
Location: 00/06-23-020-10W4/0
Location Alias: 00/06-23-20-10 W4M
Location Alias 2: 00/06-23-020-10 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 23
County/Municipality: Special Areas No. 2
Well Name: CNRL PRINCESS 6-23-20-10
Operator Name: Canadian Natural Resources Limited
License Number: 0052940
License Date: 1975-02-14
License Status: Issued
Spud Date: 1975-10-04
Final Drill Date: 1975-10-06
Well Total Depth: 751.30 m
Surface Hole Latitude: 50.710188
Surface Hole Longitude: -111.289979

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-14 Obtained License
1975-10-06 Finished Drilling
1975-10-06 Production Casing Operation Performed
1975-10-06 Well Mode changed to Drilled and Cased
1975-11-03 Perforation Treatment Performed - Jet Perforation
1975-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-05 Perforation Treatment Performed - Fractured
1975-11-13 Perforation Treatment Performed - Jet Perforation
1975-11-13 Perforation Treatment Performed - Selective Jet Perforations
1975-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-15 Perforation Treatment Performed - Fractured
1976-02-05 Well Began Production
1976-02-05 Well Fluid changed to Gas
1976-02-05 Well Mode changed to Flowing
2007-02-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-03 Perforation 717.20 718.40 13
1975-11-15 Acid Treatment 530.70 536.80 0
1975-11-15 Fracture 530.70 536.80 0
1975-11-15 Fracture 446.50 463.00 0
1975-11-05 Acid Treatment 717.20 718.40 0
1975-11-05 Fracture 717.20 718.40 0
1975-11-13 Perforation 530.70 531.30 13
1975-11-13 Perforation 536.10 536.80 13
1975-11-13 Perforation 446.50 447.40 7
1975-11-13 Perforation 449.60 449.90 7
1975-11-13 Perforation 460.90 463.00 10
1975-11-13 Selective Jet Perforations 460.90 460.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6433 0.0 0.0 0.0
1977 8539 0.0 0.0 0.0
1978 8710 0.0 0.0 0.0
1979 8450 0.0 0.0 0.0
1980 8553 0.0 0.0 0.0
1981 8692 0.0 0.0 0.0
1982 8693 0.0 0.0 0.0
1983 8705 0.0 0.0 0.0
1984 8283 0.0 0.0 0.0
1985 8583 0.0 0.0 0.0
1986 8692 0.0 0.0 0.0
1987 8221 0.0 0.0 0.0
1988 8508 0.0 0.0 0.0
1989 8731 0.0 0.0 0.0
1990 8741 0.0 0.0 0.0
1991 7267 0.0 0.0 0.0
1992 7289 0.0 0.0 0.0
1993 8634 0.0 0.0 0.0
1994 8650 0.0 0.0 0.0
1995 8040 0.0 0.0 0.0
1996 8627 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8624 0.0 0.0 0.0
2000 8632 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 8692 0.0 0.0 0.0
2003 8715 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8734 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 691 0.0 0.0 0.0

For data sources see[5]

References