X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204102206000

Well Details

Well ID: 0204102206000
Loading map...
Location: 00/06-22-020-10W4/0
Location Alias: 00/06-22-20-10 W4M
Location Alias 2: 00/06-22-020-10 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 22
County/Municipality: Special Areas No. 2
Well Name: CNRL PRINCESS 6-22-20-10
Operator Name: Canadian Natural Resources Limited
License Number: 0055164
License Date: 1975-09-30
License Status: Abandoned
Spud Date: 1975-10-11
Final Drill Date: 1975-10-13
Well Total Depth: 752.20 m
Surface Hole Latitude: 50.710029
Surface Hole Longitude: -111.312413

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-30 Obtained License
1975-10-13 Finished Drilling
1975-10-13 Well Mode changed to Drilled and Cased
1975-10-14 Production Casing Operation Performed
1976-02-14 Perforation Treatment Performed - Jet Perforation
1976-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-16 Perforation Treatment Performed - Fractured
1976-02-20 Perforation Treatment Performed - Jet Perforation
1976-02-20 Perforation Treatment Performed - Selective Jet Perforations
1976-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-22 Perforation Treatment Performed - Fractured
1976-03-14 Well Began Production
1976-03-14 Well Fluid changed to Gas
1976-03-14 Well Mode changed to Flowing
1994-02-26 Well Fluid changed to Gas
1994-02-26 Well Mode changed to Flowing
1995-07-01 Well Fluid changed to Gas
1995-07-01 Well Mode changed to Suspended
1997-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-24 Plug Back Performed
1997-02-28 Well Abandoned
1997-02-28 Well Fluid changed to Gas
1997-02-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-14 Perforation 706.20 708.40 7
1976-02-20 Selective Jet Perforations 450.20 450.80 0
1976-02-20 Selective Jet Perforations 451.40 452.00 0
1976-02-20 Selective Jet Perforations 452.90 463.90 0
1976-02-22 Acid Treatment 385.90 524.90 0
1976-02-22 Fracture 385.90 524.90 0
1997-02-24 Packing Device Capped w/Cement 370.00 378.00 0
1976-02-16 Acid Treatment 706.20 708.40 0
1976-02-16 Fracture 706.20 708.40 0
1976-02-20 Selective Jet Perforations 518.80 524.00 0
1976-02-20 Perforation 524.30 524.90 3
1976-02-20 Selective Jet Perforations 385.90 413.30 0
1976-02-20 Selective Jet Perforations 419.70 435.30 0
1976-02-20 Selective Jet Perforations 438.30 440.10 0
1976-02-20 Perforation 449.00 449.60 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6675 0.0 0.0 0.0
1977 4751 0.0 0.0 0.0
1978 2378 0.0 0.0 0.0
1979 2753 0.0 0.0 0.0
1980 4080 0.0 0.0 0.0
1981 3101 0.0 0.0 0.0
1982 3385 0.0 0.0 0.0
1983 399 0.0 0.0 0.0
1984 4457 0.0 0.0 0.0
1985 7198 0.0 0.0 0.0
1986 5059 0.0 0.0 0.0
1987 3206 0.0 0.0 0.0
1988 6653 0.0 0.0 0.0
1989 8624 0.0 0.0 0.0
1990 5167 0.0 0.0 0.0
1991 6824 0.0 0.0 0.0
1992 7595 0.0 0.0 0.0
1993 8706 0.0 0.0 0.0
1994 8188 0.0 0.0 0.0
1995 4341 0.0 0.0 0.0

For data sources see[5]

References