X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204102106022

Well Details

Well ID: 0204102106022
Loading map...
Location: 02/06-21-020-10W4/2
Location Alias: 02/06-21-20-10 W4M
Location Alias 2: 02/06-21-020-10 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 21
County/Municipality: Special Areas No. 2
Well Name: IMAGINEA PRIN 6-21-20-10
Operator Name: Cor4 Oil Corp.
License Number: 0053901
License Date: 1975-06-17
License Status: Issued
Spud Date: 1975-06-17
Final Drill Date: 1975-06-19
Well Total Depth: 691.90 m
Surface Hole Latitude: 50.708749
Surface Hole Longitude: -111.336526

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-17 Obtained License
1975-06-19 Finished Drilling
1975-06-19 Production Casing Operation Performed
1975-06-19 Well Mode changed to Drilled and Cased
1975-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-07 Perforation Treatment Performed - Fractured
1975-07-07 Perforation Treatment Performed - Jet Perforation
1975-11-25 Perforation Treatment Performed - Jet Perforation
1975-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-26 Perforation Treatment Performed - Fractured
1975-12-13 Perforation Treatment Performed - Jet Perforation
1975-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-29 Perforation Treatment Performed - Fractured
1976-01-20 Well Began Production
1976-01-20 Well Fluid changed to Gas
1976-01-20 Well Mode changed to Flowing
2001-05-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-07 Perforation 670.60 673.60 7
1975-12-13 Perforation 380.40 381.00 3
1975-12-13 Perforation 393.50 394.10 3
1975-12-13 Perforation 399.60 400.80 3
1975-12-13 Perforation 413.00 415.70 3
1975-12-29 Acid Treatment 378.90 415.70 0
1975-12-29 Fracture 378.90 415.70 0
1975-07-07 Fracture 670.60 673.60 0
1975-07-07 Acid Treatment 670.60 673.60 0
1975-11-25 Perforation 482.80 484.00 7
1975-11-25 Perforation 485.50 486.20 7
1975-11-25 Perforation 488.30 489.50 7
1975-11-26 Acid Treatment 482.80 489.50 0
1975-11-26 Fracture 482.80 489.50 0
1975-12-13 Perforation 378.90 379.50 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7743 0.0 0.0 0.0
1977 7268 0.0 0.0 0.0
1978 6920 0.0 0.0 0.0
1979 7064 0.0 0.0 0.0
1980 6574 0.0 0.0 0.0
1981 5898 0.0 0.0 0.0
1982 4109 0.0 0.0 0.0
1983 818 0.0 0.0 0.0
1984 6213 0.0 0.0 0.0
1985 6358 0.0 0.0 0.0
1986 5410 0.0 0.0 0.0
1987 2257 0.0 0.0 0.0
1988 2886 0.0 0.0 0.0
1989 2160 0.0 0.0 0.0
1990 20 0.0 0.0 0.0
1991 1519 0.0 0.0 0.0
1992 4577 0.0 0.0 0.0
1993 8636 0.0 0.0 0.0
1994 8622 0.0 0.0 0.0
1995 8634 0.0 0.0 0.0
1996 8108 0.0 0.0 0.0
1997 8648 0.0 0.0 0.0
1998 8631 0.0 0.0 0.0
1999 8528 0.0 0.0 0.0
2000 8561 0.0 0.0 0.0
2001 2819 0.0 0.0 0.0

For data sources see[5]

References