X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204093404020

Well Details

Well ID: 0204093404020
Loading map...
Location: 02/04-34-020-09W4/0
Location Alias: 02/04-34-20-09 W4M
Location Alias 2: 02/04-34-020-09 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 09
Section: 34
County/Municipality: Special Areas No. 2
Well Name: CARDINAL JENNER 4-34-20-9
Operator Name: Cardinal Energy Ltd.
License Number: 0191634
License Date: 1996-09-24
License Status: Abandoned
Spud Date: 1996-10-24
Final Drill Date: 1996-10-27
Well Total Depth: 1010.00 m
Surface Hole Latitude: 50.733497
Surface Hole Longitude: -111.176653

For data sources see[1][2]

Well History

Date Event
1996-09-24 Obtained License
1996-10-25 Surface Casing Operation Performed
1996-10-27 Finished Drilling
1996-10-27 Production Casing Operation Performed
1996-10-27 Well Log Performed
1996-10-27 Well Mode changed to Drilled and Cased
1996-10-28 Rig Released
1996-11-06 Perforation Treatment Performed - Jet Perforation
1996-11-06 Well Log Performed
1996-11-29 Well Began Production
1996-11-29 Well Fluid changed to Crude Oil
1996-11-29 Well Mode changed to Pumping
2000-12-14 Perforation Treatment Performed - Jet Perforation
2000-12-14 Well Fluid changed to Crude Oil
2000-12-14 Well Log Performed
2000-12-14 Well Mode changed to Pumping
2010-04-08 Well Fluid changed to Crude Oil
2010-04-08 Well Mode changed to Suspended
2013-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-05-27 Plug Back Performed
2013-05-27 Well Fluid changed to Crude Oil
2013-05-27 Well Mode changed to Abandoned Zone
2019-05-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-11-06 Perforation 957.30 958.80 14
2000-12-14 Perforation 865.00 867.00 17
2013-05-27 Packing Device Capped w/Cement 937.00 945.00 0
2013-05-27 Packing Device Capped w/Cement 855.00 863.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 768 0.0 0.0 0.0
1997 8732 0.0 0.0 0.0
1998 8668 0.0 0.0 0.0
1999 7270 0.0 0.0 0.0
2000 7308 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References