X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204093006000

Well Details

Well ID: 0204093006000
Loading map...
Location: 00/06-30-020-09W4/0
Location Alias: 00/06-30-20-09 W4M
Location Alias 2: 00/06-30-020-09 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 09
Section: 30
County/Municipality: Special Areas No. 2
Well Name: CNRL JENNER 6-30-20-9
Operator Name: Canadian Natural Resources Limited
License Number: 0049669
License Date: 1974-05-06
License Status: Issued
Spud Date: 1974-05-10
Final Drill Date: 1974-05-18
Well Total Depth: 702.60 m
Surface Hole Latitude: 50.722378
Surface Hole Longitude: -111.244544

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-06 Obtained License
1974-05-18 Finished Drilling
1974-05-18 Production Casing Operation Performed
1974-05-18 Well Log Performed
1974-11-22 Well Mode changed to Drilled and Cased
1975-10-21 Perforation Treatment Performed - Jet Perforation
1975-11-16 Perforation Treatment Performed - Jet Perforation
1975-11-16 Perforation Treatment Performed - Selective Jet Perforations
1975-11-16 Well Mode changed to Drilled and Cased
1976-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-29 Perforation Treatment Performed - Fractured
1976-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-31 Perforation Treatment Performed - Fractured
1976-02-24 Well Began Production
1976-02-24 Well Fluid changed to Gas
1976-02-24 Well Mode changed to Flowing
1986-08-01 Well Fluid changed to Gas
1986-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-21 Perforation 675.40 675.70 3
1975-11-16 Perforation 429.20 429.80 7
1976-01-29 Acid Treatment 675.40 681.50 0
1976-01-29 Fracture 675.40 681.50 0
1976-01-31 Acid Treatment 390.80 501.10 0
1976-01-31 Fracture 494.10 501.10 0
1976-01-31 Fracture 390.80 429.80 0
1975-10-21 Perforation 680.30 681.50 10
1975-11-16 Perforation 494.10 494.70 13
1975-11-16 Perforation 500.50 501.10 13
1975-11-16 Selective Jet Perforations 390.80 390.80 0
1975-11-16 Selective Jet Perforations 412.40 413.30 0
1975-11-16 Selective Jet Perforations 414.20 414.20 0
1975-11-16 Selective Jet Perforations 420.30 420.30 0
1975-11-16 Perforation 425.80 427.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5676 0.0 0.0 0.0
1977 8550 0.0 0.0 0.0
1978 8024 0.0 0.0 0.0
1979 8540 0.0 0.0 0.0
1980 8535 0.0 0.0 0.0
1981 8596 0.0 0.0 0.0
1982 8657 0.0 0.0 0.0
1983 8708 0.0 0.0 0.0
1984 8238 0.0 0.0 0.0
1985 8727 0.0 0.0 0.0
1986 8510 0.0 0.0 0.0
1987 8322 0.0 0.0 0.0
1988 8489 0.0 0.0 0.0
1989 8714 0.0 0.0 0.0
1990 8742 0.0 0.0 0.0
1991 8726 0.0 0.0 0.0
1992 8737 0.0 0.0 0.0
1993 8637 0.0 0.0 0.0
1994 8650 0.0 0.0 0.0
1995 8040 0.0 0.0 0.0
1996 8627 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8624 0.0 0.0 0.0
2000 8632 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 8692 0.0 0.0 0.0
2003 8715 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8734 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8697 0.0 0.0 0.0
2008 8655 0.0 0.0 0.0
2009 8737 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 8761 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8751 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8714 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References